|
<br />I
<br />
<br />I
<br />I
<br />
<br />I
<br />I
<br />
<br />I
<br />I
<br />I
<br />
<br />(
<br />
<br />,
<br />
<br />,.
<br />I-
<br />I
<br />
<br />I
<br />
<br />,
<br />
<br />I
<br />
<br />I
<br />I
<br />
<br />I
<br />I
<br />I
<br />
<br />Lettenmaier, D.P. Wallis, J.R. and Wood, E.F. (1987):
<br />Effect of regional heterogeneity on flood frequency
<br />estimation, Water Resources Research, 23, 313-323.
<br />Loh, M. Kades, K. and Hill, C. (1997): A joint probability
<br />approach to determining the probability of overtopping
<br />of the Thomson Dam. ANCOLD Bulletin, 105, 65-73.
<br />Lowing, M.J. and Law, F.M. (1995): Reconciling flood
<br />frequency curves with the probable maximum flood,
<br />BHS 5th National Hydrology Symposium, Edinburgh,
<br />3.37-3.44.
<br />
<br />Masters, C.J. and Irish, J.L. (1994): Areal reduction factors
<br />for the Sydney region derived from spatial
<br />characteristics of heavy rainfall. Hydrology and Water
<br />Resources Symposium 1994, Adelaide, IE Aus/. Natl.
<br />Cont. Publ. No. 94115, 27-32.
<br />McConachy, F.L.N. (1997): Estimation of the rainfall
<br />frequency curve in the extreme range using regional
<br />methods. PhD thesis, Monash University,
<br />McConachy, F.L.N., Weinman, P.E., Nathan, R.J. and
<br />Mein, R.G. (1997): Confidence limits for rainfall
<br />frequency curves in the extreme rainfall range.
<br />Proceedings, 24~ Hydrology and Water Resources
<br />Symposium, Auckland, New Zealand, 333-338.
<br />McKay, M.D. (1988) Sensitivity and uncertainty analysis
<br />using a statistical sample of input variables, in:
<br />Uncertainty Analysis, edited by Y. Ronen, CRC Press,
<br />Inc, Boca Raton, Florida, 145-186.
<br />McMahon, TA and Mein, R.G. (1986): River and reservoir
<br />yield. Water Resources Publications, Colorado, U.S.A.,
<br />368pp.
<br />Meighen, J. and Kennedy, M.R. (1995): Catalogue of
<br />significant rainfall occurrences over southeast Australia.
<br />Hydrology Report Series, Report No.3, Hydrology Unit,
<br />Bureau of Meteorology, Melbourne.
<br />Melching C.S. (1992): An improved first-order reliability
<br />approach for assessing uncertainties in hydrologic
<br />modelling. Journal of Hydrology, 132, 157-177.
<br />Melching, C.S. (1995): Reliability estimation, in Computer
<br />models of watershed hydrology, ed Singh, V.P., Water
<br />Resources Publications, Colorado.
<br />Melching C.S., Yen, B.C. and Wenzel, H.G. (1990): A
<br />reliability estimation in modelling watershed runoff with
<br />uncertainties. Water Resources Research 26(10):
<br />Minty, L., Meighen, J., and Kennedy, M.R. (1996):
<br />Development 'of the Generalised Southeast Australia
<br />Method for estimating Probable Maximum Precipitation,
<br />Hydrology Report Series No.4, Hydrology Unit, Bureau
<br />of Meteorology, Melbourne.
<br />Nandakumar, N., P. E. Weinmann, R.G. Mein, and RJ.
<br />Nathan (1997): Estimation of extreme rainfalls for
<br />Victoria using the CRC-FORGE method (for rainfall
<br />durations 24 to 72 hours). CRC Research Report 9714,
<br />Melbourne, Cooperative Research Centre for
<br />Catchment Hydrology.
<br />Nathan, RJ. (1992): The derivation of design temporal
<br />patterns for use with generalised estimates of Probable
<br />Maximum Precipitation. Civil Engng. Trans., IE Aust.
<br />Vol CE34(2), 139-150.
<br />Nathan, R.J. (1~): l'tle est\rt1atilm of conGUITentflooding.
<br />Paper prepared for the NSW Department of Land and
<br />j, Water Resources, November 1996. .
<br />Nathan, R.J., Weinmann, P.E., and Gato, S (1994): A qUick
<br />method for estimation of the probable maximum flood in
<br />South Ea$t Australia. /nt. Hydrology Iifld Water
<br />Resources Symposium: Water Down Under, November,
<br />Adelaide, IE Aus/. Nail. Cont. Publ. No. 194, 229-234.
<br />
<br />....'-'V"- VI ~ ':;:';;'\lIIIc::n',-,I' VI Lc:ll~e LV t::A.llQ",1:;: f-'VV\.l::>
<br />
<br />Nathan, R.J., Austin, K.A., Crawford, D., and Jayasuriya, N.
<br />(1996). The Estimation of Monthly Yield in Ungauged
<br />Catchments Using a Lumped Conceptual Model. Aus/.
<br />J. Water Engin., 1(2): 65-75.
<br />
<br />Nathan, RJ. and Bowles, D.S. (1997): A probability-neutral
<br />approach to the estimation of design snowmelt floods.
<br />Proceedings of the Hydrology and Water Resources
<br />Symposium: Wei-Whenua, November 1997, Auckland,
<br />125-130.
<br />
<br />JNathan, RJ. and Weinmann, P.E. (1995): The estimation of
<br />extreme floods - the need and scope for revision of our
<br />national guidelines. Aust. J. WaterEnging., 1(1): 40-50.
<br />
<br />JNathan, R.J., Weinmann, P.E., and Minty, L. (1998):
<br />Estimation of the Annual Exceedance Probability of
<br />PMP Events in Southeast Australia, paper submitted to
<br />the Aus. J. Water Resour.
<br />
<br />National Research Council, Committee on Techniques for
<br />Estimating Probabilities of Extreme Floods (1988):
<br />Estimating Probabilities of Extreme Floods, Methods
<br />and Recommended Research, National Acadamy
<br />Press, Washington D.C.
<br />
<br />Natural Environment Research Council ,(1975): Flood
<br />Studies Report, 5 Vols, Natural Environment Research
<br />Council, Institute of Hydrology, Wallingford, UK.
<br />
<br />Pearce, H.J. and Kennedy, M.R. (1993): Generalised
<br />Probable Maximum Precipitation Estimation techniques
<br />for Australia, Hydrology and Water Resources
<br />Symposium, Newcastle, June 30 - July 2, 1993,
<br />Institution of Engineers Australia, National Conference
<br />Publication No. 93114.
<br />
<br />Pearse, MA and Laurenson, E.M. (1997): Real
<br />probabilities for real floods. Proc., ANCOLD 1997
<br />Conference on Dams. ANCOLD.
<br />
<br />, Pickup, G. (1989): Paleoflood hydrology and estimation of
<br />the magnitude, frequency and areal extent of extreme
<br />floods - an Australian perspective. Civil Engineering
<br />Transactions of/. E Aus/., CE31: 19-29.
<br />
<br />Pickup, G., Wasson, RJ., Warner, R.F., Tongway, D. and
<br />Clark, R.L. (1987): A feasibility study of geomorphic
<br />research for the long term management of uranium mill
<br />tailings. CSIRO Division of Water Resources Research
<br />Divisional Report No. 8712.
<br />
<br />'Pickup, G., Allan, G. and Baker, V.R. (1988): History,
<br />palaeochannels and palaeofloods of the Finke River,
<br />Central Australia. In: RF. Warner (Ed.), Fluvial
<br />geomorphology of Australia. Academic Press, Sydney,
<br />pp. 177-200.
<br />
<br />Pilgrim, D.H. and Cordery, I., and French, R (1969):
<br />Temporal patterns of design rainfall for Sydney, Civil
<br />Engng. Trans., IE Aust. Vol CE11(1), 9-14.
<br />
<br />Pilgrim, D.H. (1986) Estimation of large and extreme floods.
<br />Civ. Engg Trans, Ins/. Engrs Aus/., Vol. CE28, pp. 62-
<br />73.
<br />
<br />Potter, K.W. and Lettenmaier, D.P. (1990): A comparison of
<br />regional flood frequency estimation methods using a
<br />resampling method. Water Resources Research, 26,
<br />415-424.
<br />
<br />JQUick, M.C. (1993): UB.C. Watershed Model Manual,
<br />Version 2. O. university Of Britl$h Columbia Mo,,"tain
<br />Hydrology Group, Civil Engineering Dept., Vancouver,
<br />British Columbia.
<br />
<br />Rango, A. end Martinec, J. (1995): Revisiting the degree-
<br />day method for snowmell computations' Water Resour.
<br />Bull. 31(4): 657-669.
<br />
<br />Reed, D.W. and Stewart, E.J. (1989): Focus on rainfall
<br />growth estimation. Proc. 2'. National Hydrology
<br />Symposium, British Hydrological Society.
<br />
|