Laserfiche WebLink
<br />3.1 Hydrologic Analyses <br /> <br />Hydrologic analyses were carried out <br />discharge-frequency relationships for each <br />by detailed methods affecting the community. <br /> <br />to establish the peak <br />flooding source studied <br /> <br />Peak discharges for the 10- and 100-year floods for the City Park, <br />Nissen Reservoir, Gay Reservoir, and West Lake basins were obtained <br />from a 1979 UDFCD report (Reference 2). In the UDFCD report, the <br />10- and IOO-year flood discharges were computed using the Storm <br />Water Management computer model {Reference 3). The rainfall figure <br />used was based on Volume III of the Precipitation-Frequency Atlas of <br />the Western United States (Reference 4). <br /> <br />The SC determined the 50- and SOD-year flood discharges by plotting <br />the 10- and 100-year flood discharges on log-probability paper and <br />interpolating or extrapolating as appropriate. The 50-year flood <br />discharge was determined by interpolation; the SOa-year flood <br />discharge was determined from extrapolation. <br /> <br />Peak discharge-drainage area relationships for all flooding sources <br />are shown in Table 2. <br /> <br />3.2 Hydraulic Analyses <br /> <br />Analyses of the hydraulic characteristics of flooding <br />sources studied were carried out to provide estimates <br />elevations of floods of the selected recurrence intervals. <br /> <br />from <br />of <br /> <br />the <br />the <br /> <br />For all streams studied by detailed methods, the water-surface <br />elevations (WSELs) for floods of the selected recurrence intervals <br />were computed using the U.S. Army Corps of Engineers (USACE) HEC-2 <br />step-backwater computer program (Reference 5). <br /> <br />Cross sections used in the backwater analyses for all streams were <br />obtained by aerial photogrammetry (Reference 6). The below-water <br />sections of all cross sections were obtained by field measurement. <br />All bridges, darns, and culverts were field surveyed to obtain <br />elevation data and structural geometry. <br /> <br />Locations of selected cross sections used in <br />are shown on the Flood Profiles (Exhibit 1). <br />for which a floodway was computed (Section <br />section locations are also shown on the Flood <br />Map (FBFM) (Exhibit 2). <br /> <br />the hydraulic analyses <br />For stream segments <br />4.2), selected cross <br />Boundary and Floodway <br /> <br />Roughness factors (Manning's "nil) used in the hydraulic computations <br />for the detailed study streams were chosen by engineering judgment <br />and based on field observations. Roughness values for the main <br />channels of the streams studied ranged from 0.02 to 0.065; overbank <br />roughness values ranged from 0.02 to 0.10. <br /> <br />9 <br />