Laserfiche WebLink
<br />. <br />1.1:;;;. Do11v DUl::f:'inl(l <br />JunUiU:Y 30, 19D.) <br />l';~\JU th;;tle <br /> <br />. <br /> <br />Item <br /> <br />D,3ta <br /> <br />Channel and cross sections <br />3/W prints of mapping <br />Hyli1r Ill'lpfl of I" ~ :!Of)' <br /> <br />october 15, 1979 <br />October 15, 1<j79 <br />Novombor I, 1979 <br /> <br />The local governments had agreed to pay for the ndditionol surveys, <br />crass sectionc. and mapping. <br /> <br />HFP dCli~ed Octo]),"): 12. 1979 - Camp Dresser and f.lcI{ce, Inc., \'l<1S <br />selected to p~rform~le engineering analysis to develop the lOa-year <br />floodplain information and data on the Arkansas River for the study <br />arda, comm(ijncing ,10wnst:'Elam of Florence thence extending llpstraam <br />to nuurly i:.ho :nouth of the canyon. <br /> <br />C'Jnt::Clc.:t d,.,t'y1 I'l('\:(')ber l!;. 1979 - The CWCB signed l1 contri'\ct \'lith <br />C"mp Dresser ilnd McKee, Inc., for the i:lccomplishment of the flood <br />hazarc:. stuuy. ':'his COl1t.c~ct \.JiHj for t'hl~ a1noun"c of $19,G5C1, with <br />the 10Cdl gove:cmn.;nts receiving $24,000 in credits for securing the <br />topo9r~phic mapping, crOss sections, and surveys. <br /> <br />Letter d.'t,::d :CCCGl'i'J)(;r ;n. 1979 - 'l'l1is office <,c[vised Ci"nnp Dresser <br />and McKee, Inc.. that the mapping conpletion d~te wus rescheduled <br />from DGCerllber 15. 1979, to i?ebruiuy 15, 1980. you might be iilter- <br />estGu to notG that the original completion date was lqovembcr 1, <br />1979. Since tho mappil1<] ;111<1 cross sections <:ire essential for the <br />hydraulic studies, we advised COM to stop work on the project until <br />they receive the requirod Ini3pping and cross scctions. <br /> <br />McotinCl of ,r"'ntH11:Y In. 1980 - This moeting was called by us to <br />update local officials on the status of the project, ...,hich you 'tlill <br />rt;!call. <br /> <br />l-1~etinq of ,J~lmwr.y 29. 1980 - Mr. Jcncsok "nd I met with i"lr. Chuck <br />Guy of Kucera and Associatos, Inc., to previe'~ the qu~lity of the <br />mappinQ and receiva a st~tus report. At the meeting, Mr. Guy <br />cldvised me that to this date he has not received an official <br />"Notice.) to Proceed" froln eit.her j,l.l:. RUPP--Hwpping contri\ctor.--or <br />j;'rcmont county regarding the additional mapping needod in Sections <br />1, 2. :i5, and 12; consequently, nothing has commenced toward <br />obtaining the required mapping and C::'::055 sections. <br /> <br />ay this -lccountillg oJ: :last atudy activities, you can see that <br />much consideration has been given to the Florence-Canon city, <br />colorado, region flood ha~ard study; how~ver, progress has been <br />sl~~. The problem has been one of on-off study starts, changes in <br />study management personnel, and delays in signing contract agree- <br />ments. Today, our most optimistic completion date for the flood- <br />plain study would be April 1, 1980, provided mapping is receivc~ by <br />February 15. <br /> <br />"'f.",\~.,;')J.!I\l_'~'.~'\l1 \.Ilc',V.li~:N''''YI ,'/ II ..... .... ,,_\~.\,./_'" ., <br /> <br />I 11:-,1_':.-.- <br /> <br />t,\ <br />~ "'. <br />