My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01687
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01687
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:02:49 PM
Creation date
10/4/2006 10:16:50 PM
Metadata
Fields
Template:
Floodplain Documents
County
Prowers
Community
Holly
Stream Name
Arkansas River
Title
Holly Flood Control Project
Date
11/1/1981
Prepared For
Prowers County
Prepared By
US Army Corps of Engineers
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'-- <br /> <br />, <br /> <br />. <br /> <br />SWDP 1150-2-1 <br />26 May 78 <br /> <br />b. Construction equipment, supplies, forms. etc., shall not be <br />stored in the floodway during the construction. <br /> <br />c. Restore all disturbed areas to original grade and turf. <br />. <br /> <br />d. See haul road requirements and restrictions under Roadway <br />Cros~ings of Floodways. <br /> <br />e. Se~.General Criteria. <br /> <br />7. CRITERIA FOR PUMP DISCHARGE PIPELINES OVER LEVEES <br /> <br />a. The invert of the discharge lines shall be at the top of the <br />protective works (levee) and shall be free-vented at the highest point. <br /> <br />b. No flap (automatic) gates are required at the outfall of the <br />discharge lines. <br /> <br />c. Provide scour protection at the outfall consisting of riprap or <br />a stilling basin depending upon the issuing jet velocity. <br /> <br />'- <br /> <br />8. ELECTRICAL & TELEPHONE CRITERIA FOR OVERHEAD WIRE CROSSINGS. <br /> <br />a. No structure (poles or otherwise) shall be located closer than <br />10 feet from the toe of any levee. <br /> <br />b. No structure (poles or otherwise) shall be located closer than <br />15 feet from the top of any channel backslope. <br /> <br />c. Provide a minimum vertical clearance of 20 feet between the <br />crown of the levee and the low wire at the low point of the wire at the <br />levee crossing computed under the most adverse conditions (temperature, <br />wind, load, etc.). <br /> <br />d. Provide a minimum vertical clearance of 20 feet between the <br />natural ground and the low wire at the low point of the sag in the area <br />of the floodway channel, or 3 feet above the floodway design water <br />surface level. whichever is higher. (Check Electrical Code for minimum <br />clearances for high voltage lines.) <br /> <br />e. Locate guy wires and anchors in such a manner that they do not <br />interfere with the operation and/or maintenance of the channel. levees, <br />or related structures. <br /> <br />f. Also see crossing under and over Rivers and Channel Criteria. <br /> <br />\ <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.