Laserfiche WebLink
<br />APPENDIX B <br /> <br />1. Agreement Between the United States of America and the Holly Flood <br /> <br /> <br />Control, Drainage and Sanitation District for the construction of the <br /> <br /> <br />Holly Flood Control Project, executed on 7 September 1978. <br /> <br />2. Agreement Between the State of Colorado, State Department of Highways, <br /> <br /> <br />Division of Highways and the Holly Flood Control, Drainage and Sanitation <br /> <br /> <br />District Relating to Construction and Maintenance of Flood Protection <br /> <br /> <br />Near Holly, Prowers County, Colorado, dated 23 April 1979. <br /> <br />3. Agreement Between the Atchison, Topeka and Santa Fe Railway Company <br /> <br />and the Holly Flood Contro~Drainage and Sanitation District Relating to <br /> <br />Construction and Maintenance of Flood Protection Near Holly, Prowers <br /> <br />County, Colorado, dated 24 September 1979. <br /> <br />4. Pamphlet No. 1150-2-1, 26 May 1978, Criteria for Additional Construction <br />Within the Limits of Existing Floodways. <br /> <br />5. Semi-Annual Inspection and Report Checklist. <br />