Laserfiche WebLink
<br />'['ABLE A-3 (cont.) <br /> <br />Random Borrow <br /> <br />ImpE,rvious Pill <br /> <br />Random Fill <br /> <br />Inspection of Trench Excavation <br /> <br />TopEoil <br /> <br />Stripping <br /> <br />Seec.ing <br /> <br />Outlet Works <br /> <br />36-in Rep <br /> <br />54-in Precast Manhole <br /> <br />Precast Flared End Section <br /> <br />Trash Rack <br /> <br />Earth Excavation <br /> <br />Compacted Backfill <br /> <br />Em,"rgency Spillway <br /> <br />Concrete <br /> <br />Reinforcing Steel <br /> <br />Fill and Frost Blanket <br /> <br />Sump Drain <br /> <br />Wall Drains <br /> <br />Earth Excavation <br /> <br />Compacted Backfill <br /> <br />Handr:ail <br /> <br />Channel <br /> <br />Stripping <br /> <br />Earth Excavation and F:_ll <br /> <br />Concrete Removal <br /> <br /> Est:imated <br />Q~Ji'Tl!oi ty Cost <br />._----~--- <br />? 0 '7,_00 c.y. 169,800 <br />126,000 c.y. 107,100 <br />In,'>80 c.y. 146,700 <br />24,000 c.y. 19,700 <br />13, ':;00 c.y. 20,200 <br />14 , ~:; 'J 0 c.y. 18,100 <br />17 ac. 8, ',00 <br /> <br />]. 14-00 1. f. <br /> <br />67,200 <br /> <br />[,. S. <br /> <br />',()O <br /> <br />:~.r . s. <br /> <br />400 <br /> <br />::.1.8. <br /> <br />600 <br /> <br />l,:2 ',0 c.y. <br /> <br />2,500 <br /> <br />1,1:10 c,y. <br /> <br />2,200 <br /> <br /> 2,500 c..y. 187,500 <br />l, '75.000 Ib5. 137,500 <br /> 3,275 c..y. 22,900 <br /> 300 l..f. 1,1OI] <br /> 290 l..f. 1,301] <br /> 500 C.y. 1,000 <br /> 250 c.y. 500 <br /> 290 lof. 2,300 <br /> <br />13 ,l.C 0 c.y. 12,200 <br />J:), sea c.y. 313,700 <br />?2,500 s. f. 5,000 <br />