Laserfiche WebLink
<br />VIII. CONSTRUCTION PROGRAM <br /> <br />Because of t:he amount of the total e,stimated capital expenditures <br />required for the drainage and flood Gont:rol improvements <br />($13,190,400*), we have separated the expenditures into stages <br />or c::mstruct.ion programs. Since the construction co~;t:s were <br />esti:nated in such smaLL seqment:s, alnost any combinat:ion of seg- <br />ments can be grouped into a construct:ion proqramo We recommend <br />fOll::Jwing the staged construction proqram. . <br /> <br />?tag'~ l~ <br /> <br />As part of the Stage 1 proqram,. the highE,st priority must be placE,d <br />on immediately ob.taining and holdinq land for the proposed storagE' <br />facilities and drainage improvement riqhts-of-way. Because of the <br />exte:~si ve existing development and the rapid rat:e of continuing <br />development, no other economic solutions for the watershed drainaqe <br />and flood control problems will be availablE, if t:his land is lost, <br /> <br />Next in order of priority for the drainaqe and flood control im- <br />provements is the construction of th", proposed storage facilities <br />and .the necessary appurtenances.. '1'his will s:erve to provide im- <br />mediate solutions for t:he most critical problems, 1. e.., (1) provide <br />a drainage outlet for t:he upper watershed, and (2) reduce the down-' <br />stream flooding potential. <br /> <br />In o:~der to provide a drainage out:let for the upper \oratershed, the <br />outlet works at Pond A-oB should be modified and the proposed drain-. <br />age pipe which conveys the storm wat:€'r from Pond l\-B to the inter-. <br />section of Havana Street and E. Alameda ,~venue should be constructed.. <br />ConsLruction of the Upper Lowry Detel'tion Pond and Kelly Hoad Dam <br />improvements are part of the Staqe 1 construction because these two <br />detention facilities will reduce the flooding potential in the <br />dowm;tream reaches. The low flow pi"E' and the flood channel from <br />the :Lntersection of S. Havana Stxeet and E. A.lameda l'.venue to the <br />proposed Upper Lowry Detent.ion Pond a r'2 essential as part of the <br />Upper Lowry Detent:ion Pond construction.. <br /> <br />The estimated capital expend.itun~s fer the recommended Stage lA <br />construction program are as follows: <br /> <br />* Land costs for Upper Lowry Det.ention Dam and channels are not <br />included. <br /> <br />-38oH <br />