Laserfiche WebLink
<br />Itel~ <br /> <br /> TABLE Ii <br />WESTERLY CREEK COST ~;UMMARY <br />A. Channel Implwvements (1) <br /> 5-yr .1 0"71' 25-yr 100-yr <br /> _9~1,-._ __i~~,E~ ~nne.1n__ - Channel <br /> $ 34,800 " 38,060 $ 1,0,490 " 45,800 <br /> .) '.' <br /> 1,094,000 1,091.,000 1,500,500 2,274,900 <br /> 546,000 623,000 nO,550 1,134,400 <br /> 260,700 34iJ,OOO 380,600 40l,lOO <br /> 226,000 <br /> 141,400 15",100 200,400 303,600 <br /> 510,500 556,500 7ll,600 1,087,000 <br /> .__255 ,20(~ .__287:.,70Q, 356, 8Q~~ 51.2,000 <br /> $2,842,600 !?3,096,360 $3,960,91,0 $6,014,800 <br /> $ 6,000 " 6,000 $ 6,OO() S 6,000 <br /> " , <br /> $ 195,900 " 212,800 $ 270,50{) ,. 407,700 <br /> " " <br /> <br />L Rig'~t-of-way <br /> <br />2.. Culvert <br /> <br />3.. Str'~et Cross:lng <br /> <br />4. Channel <br /> <br />5. Flood Proofing <br /> <br />6. Mis,o. & Cleanup <br /> <br />7, EngIneering /, <br />Con'cingency <br /> <br />8. F., L. & A. Costs <br /> <br />9. Total Cost <br /> <br />10. Annual Maint.. Cost <br />11. Annual Cost (2) <br /> <br />B. Upstream Storage ImprcvemElnts (1) <br /> <br />1. Dayton - Mississippi Detention Pond <br /> <br />$ 31.8,000 <br /> <br />2. Flood Channel (Pond A-B to Upper Lowry Det"ntiolJ Pond) <br /> <br />1,620,000 <br /> <br />3. Upper Lowry Detention Pond <br /> <br />1,980,000 <br /> <br />4. KeLl.y Pond Improvements <br /> <br />914,000 <br /> <br />5. Total Cost <br /> <br />$4,862,000 <br /> <br />6. Annual MaintE,nance Cost <br /> <br />$ 9,600 <br /> <br />7. Annual Cost (2) <br /> <br />$ 334,000 <br /> <br />NO~:ES: (1) Developed for the Phase A report in order to determi.ne the <br />cost-benefit ratios. Costs I'or Phase n are higher. <br /> <br />(2) The annual cost was based on an interest rate of 6.375% <br />and an economic li.fe of 50 )'Ilars, <br /> <br />--28.. <br />