My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01675
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01675
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2010 10:11:47 AM
Creation date
10/4/2006 10:16:14 PM
Metadata
Fields
Template:
Floodplain Documents
County
Arapahoe
Adams
Community
Aurora
Stream Name
Westerly Creek
Title
Major Drainageway Planning
Date
2/1/1977
Prepared For
UDFCD
Prepared By
Camp Dresser & McKee
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I. INTRODUC'rION <br /> <br />The "Report on Drainage .I-~ast.er Plan for Westerly Creek, <br />Denv,er-Aurora, Phase A," was prepared for the Urban Drainage <br />and :I"lood Control District by Can'p D)~esser "' McKee Ine. in <br />January 1976. That report provides an overview of the drainage <br />and flood control problems and 1:he qEmen'cl concepts of solutions <br />t:o the problems in the Wes1:erly Creek wio:t.ershed. ThE~ purposes <br />of this preliminary design.. phase B, are c' (1) to fur1:her examine <br />t:he alternative selected in phas.e A" ane:: (2) to provide a <br />drainage and flood control preliminar.'y c:.(:siqn for the selected <br />alte:rnative in sufficient detail for pl,,"cning and proceeding <br />with final design plans and speclficatiois. <br /> <br />The decisions reached in Pha.se )\ are l~e~ct.ated with suppor1:ing <br />explanation of the highlight,s of subEiequc:nt acti vi tiE~s. ]>ina1 <br />hydrologic and hydraulic studies are pn~pare('! a.nd pre!sented. <br />A prl~liminary drainage and flood conteroJ design for 1:he sE~lected <br />altel~native is t.hen presen1:ed with plan <md profile drawings in <br />Volume II. Cost estimates includin'J all maintenance aspects are <br />t.abulated by reach, street crossing md detention faci.lity. A <br />recommended staged construction procJnnn 1. S also included. The <br />results of this preliminary desiqn ilJ:e':mmarized in the <br />letter of transmittal at the becj:lnn::LCj cd the report. <br /> <br />The data used in this prelimina:ry deGign aro2 presented in <br />Appendix C which is on file at the O"fic" of Urban Drainage <br />and I"lood Control District. The preLiminary design data <br />incLlde: (1) hydrolo9ic analysis inc 1 ucl.:i.n.9 uni 1: hydrographs, <br />storn hydrog-raphs, flood routing, and park flow determinations;' <br />(2 )~ydraulic analysis including de:3iCJn of open channels and <br />clos,ed conduits and water surface proEi 1." conputations; <br />(3) :::>asis of detention storage desiqn inel uding s'toraqe <br />volume determinations and spillway d'''3iq:'ls; and (4) basis of <br />cost es,timate including quantities and unit cost:s. <br /> <br />.-1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.