Laserfiche WebLink
<br />I <br /> <br />PROJECT LANGBI: <br /> <br />U.S. Army CorpS of Engineers <br />Langdon Bend Alternative B - Nemaha County, NE <br />FEASIBILITY ESTIMATE <br /> <br />I <br /> <br />Fri 16 Jun 1995 <br />Eft. Date 03/21/95 <br />DETAILED ESTIMATE <br /> <br />project Distributed Costs <br /> <br />I <br /> <br />Prime Contractor <br /> <br />1 <br /> <br />Supervisor <br /> <br />I <br /> <br />OUtside Truck Dr. Heavy <br /> <br />I <br /> <br />TRK, HWY, 44,300 GVW, 3 AXLE <br />44,300 GVW, 3 AXLE <br /> <br />I <br /> <br />TRK TRLR, LOWBOY. 75 TON, 3 AXLE <br />75 TON, 3 AXLE <br /> <br />Grade Checker <br /> <br />I <br /> <br />I <br /> <br />SCRAPER,SELF, 32-44CY, 52T, PS <br />REF. EP 1110-1-8 <br />32-44 cr, 52 TON, POWERSHIFT <br /> <br />,I <br /> <br />BLADE, UNIVERSAL, HYDR (FOR 010 <br />REF. EP 1110-1-8 <br />BLADE, UNIVERSAL,HYDRAULIC, FOR <br />010 <br /> <br />,I <br /> <br />DOZER,CWLR, D-ION,PS (ADD BLADE) <br />REF. EP 1110-1-8 <br />POWERSHIF"I' (ADD BLADE) <br /> <br />1 <br /> <br />TRK,OFF-HWY,R-DUMP, 32-44CY, SOT <br />REF. EP 1110-1-8 <br />32-44 CY, SOT, REAR DUMP,POWERSH <br />1FT <br /> <br />I <br />I <br />'I <br /> <br />LDR,FE, WH, 4.00 CY, ARTIe, 966E <br />REF. EP 1110-1-8 <br />4 CY, ARTICULATED <br /> <br />I <br /> <br />TOTAL Demobilization <br /> <br />QUANTY UOM MMrnOUR <br /> <br />8.00 HR <br /> <br />352.00 HR <br /> <br />352.00 HR <br /> <br />352.00 HR <br /> <br />8.00 HR <br /> <br />48.00 HR <br /> <br />16.00 HR <br /> <br />16.00 HR <br /> <br />24.00 HR <br /> <br />8.00 HR. <br /> <br />1. 00 HRS <br /> <br />1. 00 <br />8 <br /> <br />1.00 <br />352 <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />1. 00 <br />8 <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />592 <br /> <br />TIME 14:26:30 <br /> <br />DETAIL PAGE 4 <br /> <br />LABOR EQUIPMNT MATERIAL TOTAL COST UNIT COST <br /> <br />23.10 <br />185 <br /> <br />19.23 <br />6,768 <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />12.86 <br />103 <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />11,933 <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />28.47 <br />10,023 <br /> <br />8.66 <br />3,047 <br /> <br />0.00 <br />o <br /> <br />41.98 <br />2,015 <br /> <br />4.45 <br />71 <br /> <br />26.76 <br />428 <br /> <br />30.33 <br />728 <br /> <br />12.78 <br />102 <br /> <br />18,158 <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />,I <br /> <br />On-site Operations <br />Per diem of $50 per day was added to account for travel based on the Corps' <br />review comment number 101. It is assumed that the contractor will come <br />from Omaha which would be to far to travel back and forth on a daily basis. <br /> <br />I <br /> <br />The crew is made up of the following: <br />1 Supervisor <br />1 Forman <br />3 Laborers <br /> <br />I <br /> <br />I <br /> <br />LABOR In: CIVTTA <br /> <br />EQUIP ID: MR0054 <br /> <br />CUrrency in DOLLARS <br /> <br />23.10 <br />185 <br /> <br />23.10 <br /> <br />19.23 <br />6,768 <br /> <br />19.23 <br /> <br />28.4 7 <br />10,023 <br /> <br />28.47 <br /> <br />8.66 <br />3,047 <br /> <br />8.66 <br /> <br />12.86 <br />103 <br /> <br />12.86 <br /> <br />41. 98 <br />2,015 <br /> <br />41.98 <br /> <br />4.45 <br />71 <br /> <br />4.45 <br /> <br />26.76 <br />428 <br /> <br />26.76 <br /> <br />30.33 <br />728 <br /> <br />30.33 <br /> <br />12.78 <br />102 <br /> <br />12.78 <br /> <br />o <br /> <br />30,091 30090.92 <br /> <br />CREW ID: MRONAT UPB In: MRON93 <br />