Laserfiche WebLink
<br />I <br /> <br />Fri 16 Jun 1995 <br />Eff. Date 03/21/95 <br />DETAILED ESTIMATE <br /> <br />PROJEcr LANGB1: <br /> <br />U.S. Army Corps of Engineers <br />Langdon Bend Alternative B - Nemaha County, NE <br />FEASIBILITY ESTIMATE <br />Project Distributed Costs <br /> <br />TIME 14:26:30 <br /> <br />I <br /> <br />DETAIL PAGE <br /> <br />2 <br /> <br />I <br /> <br />Prime Contractor <br /> <br />QUANTI UOM MANHOUR <br /> <br />LABOR EQUIPMNT MATERIAL TOTAL COST UNIT COST <br /> <br />I <br /> <br />8KT,CLAM,l-1/8CY,GEN PURP/SQNOSE 0.00 0 00 0.99 0.00 0.99 <br />REF. EP 1110-1-8 8.00 HR 0 0 8 0 8 0.99 <br />1.125 cr, GEN. PURPOSE/SQUARE NO <br />SE <br />LDR,FE, CRWLR, 2.00 cr 0.00 0.00 8.27 0.00 8.27 <br />REF. EP 1110-1-8 8.00 HR 0 0 66 0 66 8.27 <br />2.00 cr <br />Supervisor 1. 00 23.10 0.00 0.00 23.10 <br /> 8.00 HR 8 185 0 0 185 23.10 <br />OUtside Truck Dr. Heavy 1. 00 19.23 0.00 0.00 19.23 <br /> 352.00 HR 352 6,768 0 0 6,768 19.23 <br />TRK, HWY, 44,300 GVW, 3 AXLE 0.00 0.00 28.47 0.00 28.47 <br />44,300 GVW, 3 AXLE 352.00 HR 0 0 10,023 0 10,023 28.47 <br />TRK TRLR, LOWBOY, 75 TON, 3 AXLE 0.00 0.00 8.66 0.00 8.66 <br /> 75 TON, 3 AXLE 352.00 HR 0 0 3,047 0 3,047 8.66 <br />Grade Checker 1.00 12.86 0.00 0.00 12.86 <br /> 8.00 HR 8 103 0 0 103 12.86 <br />SCRAPER,SELF, 32-44CY, 52T, PS 0.00 0.00 41.98 0.00 41.98 <br />REF. EP 1110-1-8 48.00 HR 0 0 2,015 0 2,015 41. 98 <br />32-44 cr, 52 TON, POWERSHIFT <br />BLADE, UNIVERSAL , HYDR (FOR 010 0.00 0.00 4.45 0.00 4.45 <br />REF. EP 1110-1-8 16.00 HR 0 0 71 0 71 4.45 <br />BLADE, UNIVERSAL, HYDRAULIC, FOR <br />010 <br />DOZER, CWLR, D-10N,PS (ADD BLADEl 0.00 0.00 26.76 0.00 26.76 <br />REF. EP 1110-1-8 16.00 HR 0 0 42. 0 428 26.76 <br />POWERSHIFT (ADD BLADE) <br />TRK,OFF-HWY,R-DUMP, 32-44CY, SOT 0.00 0.00 30.33 0.00 30.33 <br />REF. EP 1110-1-8 24.00 HR 0 0 728 0 72' 30.33 <br />32-44 cr, SOT, REAR DUMP, POWERSH <br />1FT <br />LDR,FE, W!!, 4.00 cr, ARTIC, 966E 0.00 0.00 12.78 0.00 12.78 <br />REF. EP 1110-1-8 8.00 HR 0 0 102 0 102 12.78 <br />4 cr, ARTICULATED <br /> --------- --------- --------- ----------- <br />TOTAL Mobilization 1. 00 HRS 592 11,933 18,158 0 30,091 30090.92 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />II <br />I <br /> <br />I <br /> <br />I <br /> <br />,I <br /> <br />,I <br />I <br /> <br />I <br /> <br />I <br /> <br />LABOR 1D: C1V'ITA <br /> <br />EQUIP ID: MR0054 <br /> <br />CUrrency in DOLLARS <br /> <br />CREW 1D: MRONAT UPB 1D: MRON93 <br />