Laserfiche WebLink
<br />I <br /> <br />Fri 16 Jun 1995 <br />Eff. Date 03/21/95 <br /> <br />PROJECT LANGB1: <br /> <br />u.s. Army Corps of Engineers <br />Langdon Bend Alternative B - Nemaha County, NE <br />FEASIBILITY ESTIMATE <br />.. PROJECT OWNER SUMMARY - LEVEL 1 ** <br /> <br />TIME 14:26:30 <br /> <br />I <br /> <br />SUMMARY' PAGE <br /> <br />1 <br /> <br />------------------------------------------------------------------------------------------------------------------------------- <br /> <br />1 <br /> <br />QUANTITY UOM <br /> <br />CONTRACT ESCALATN CONTINGN <br /> <br />E&D <br /> <br />S&A TOTAL COST UNIT COST <br /> <br />I <br /> <br />01 Lands and Damages 1.00 EA 895,000 0 0 0 0 895,000 895000.00 <br />06 Fish and Wildlife Facilities 1. 00 EA 5,230,236 0 1,046,047 0 0 6,276,284 6276284 <br />30 Planning, Engineering and Design 313,814 0 0 0 0 313,814 <br />31 Construction Management 376,577 0 0 0 0 376,577 <br /> ----------- --------- --------- --------- --------- ----------- <br /> Langdon Bend Alternative B 1. 00 EA 6,815,627 0 1,046,047 0 0 7,861,675 7861675 <br /> <br />I <br /> <br />1 <br /> <br />I <br /> <br />I <br /> <br />1 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />LABOR ID: CIVTrA <br /> <br />EQUIP 10; MR0054 <br /> <br />CUrrency in DOLLARS <br /> <br />CREW 10: MRONAT UPS 10; MRON93 <br />