My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01627
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01627
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 10:40:29 AM
Creation date
10/4/2006 10:11:24 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
Nemaha County Nebraska
Stream Name
Missouri River Miles 532.4-528.9
Title
Langdon Bend Habitat Restoration/Preservation Project Volume 3
Date
6/1/1995
Prepared For
US Army Corps of Engineers
Prepared By
Greenhorne & O'Mara, Inc.
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />II <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Fri 16 Jun 1995 <br />Eff. Date 03/21/95 <br />PROJECT NOTES <br /> <br />LABOR ID: CIVT'I'A <br /> <br />PROJECT LANGAl: <br /> <br />u. S. Anny Corps of Engineers <br />Langdon Bend Alternative Al - Nemaha County. NE <br />FEASIBILITY ESTIMATE <br /> <br />TIME 14:22:01 <br /> <br />TITLE PAGE 2 <br /> <br />This alternative consists of excavating a 10' wide pilot channel with <br />2H to IV sideslopes. The pilot channel will have riprap inlet and outlet <br />structures, and a grade control structure all of which are sized for <br />the ultimate channel width of 200'. The excess material generated by <br />clearing and grubbing will be placed in rows just beyound the limits of <br />disturbance. The excess material generated by the pilot channel will be <br />placed in a berm along the east side of the channel. Cleared and Grubbed <br />material will be left on site. <br /> <br />The project was designed by Greenhorne & D'Mara, Inc. and quantities for the <br />estimate were completed by the same A & E firm. <br /> <br />Contingencies for the project are set at 20\. Planning, Engineering, & <br />Design were assumed to be 5% based on review comment number 60 from the Corps. <br />The CorpS's review comments are included in the supporting data for this <br />estimate provided under separate cover. Construction Management was assumed <br />to be 6% based on the project template sent by the Corps. <br /> <br />EQUIP ID: MR0054 <br /> <br />Currency in DOLLARS <br /> <br />UPB ID: MRON93 <br /> <br />CREW ID: MRONAT <br />
The URL can be used to link to this page
Your browser does not support the video tag.