<br />DETAILED ESTIMATE
<br />
<br />u.s. Army Corps of Engineers
<br />PROJECT LANGA2; Langdon Bend Alternative A2 - Nemaha County, NE
<br />FEASIBILITY ESTIMATE
<br />
<br />TIME 14:23:51
<br />
<br />I
<br />
<br />DETAIL PAGE 7
<br />
<br />06. Fish and wildlife Facilities
<br />
<br />1
<br />
<br />Wildlife Facilities & Sanctuary
<br />
<br />QUANTY UOM MANHOUR
<br />
<br />LABOR EQUIPMNT MATERIAL TOTAL COST UNIT COST
<br />
<br />I
<br />
<br />Fish and Wildlife Facilities
<br />
<br />wildlife Facilities & Sanctuary
<br />
<br />I
<br />
<br />CLEARING AND GRUBBING
<br />
<br />I
<br />
<br />Two DBN dozers will be used to complete this work. The material will be
<br />pushed off the the side and left on site. Based on the Corps' review
<br />comment number 98 and discussons with Rich Stricker from the Corps, this
<br />work will be completed at a rate of 0.1 acres per hour.
<br />
<br />I
<br />
<br />OUtside Equip. Op. Heavy 1.00 23.41 0.00 0.00 23.41
<br /> 400.00 HR 400 9,364 0 0 9,364 23.41
<br />DOZER,CWLR,CAT D-8N, (ADD BLADE) 0.00 0.00 65.12 0.00 65.12
<br />POWERSHIFT , (ADD BLADE) 400.00 HR 0 0 26,050 0 26,050 65.12
<br />BLADE, UNlVERSAL,HYDR,FOR D8 0.00 0.00 6.93 0.00 6.93
<br />BLADE, UNlVERSAL,HYDRAULIC,FOR D 400.00 HR 0 0 2,773 0 2,773 6.93
<br />TRK,HWY,4X2,F250,3/4T,8600 GVW 0.00 0.00 6.41 0.00 6.41
<br />4X2 3/4-TON PICK-UP, 8600 GVW 200.00 HR 0 0 1,281 0 1,281 6.41
<br />Foreman 1.00 25.00 0.00 0.00 25.00
<br /> 200.00 HR 200 5,000 0 0 5,000 25.00
<br />OUtside Laborer (Semi-Skilled) 1.00 9.72 0.00 0.00 9.72
<br /> 400.00 HR 400 3,887 0 0 3,887 9.72
<br />CHAINSAW, 31" BAR 0.00 0.00 1.55 0.00 1.55
<br />CHAINSAW - 31" BJ\R 400.00 HR 0 0 622 0 622 1.55
<br /> --------- --------- --------- -----------
<br />TOTAL CLEARING AND GRUBBING 20.00 AC 1,000 18,251 30,725 0 48,976 2448.80
<br />
<br />1
<br />
<br />I
<br />
<br />I
<br />
<br />II
<br />
<br />II
<br />
<br />I
<br />
<br />I
<br />II
<br />
<br />STRIP & STOCKPILE TOPSOIL
<br />
<br />Two D8N dozers will complete this work at a rate of 225cy per hr. The
<br />material will be pushed off the the side and stockiled for use later.
<br />
<br />I
<br />II
<br />
<br />OUtside Equip. Op. Heavy 1.00 23.41 0.00 0.00 23.41
<br /> 285.33 HR 28S 6,680 0 0 6,680
<br />DOZER,CWLR,CAT D-8N, (ADD BLADE) 0.00 0.00 65.12 0.00 65.12
<br />POWERSHIFT , (ADD BLADE) 285.33 HR 0 0 18,582 0 18,582
<br />BLADE, UNIVERSAL, HYDR, FOR D8 0.00 0.00 6.93 0.00 6.93
<br />BLADE, UNlVERSAL,HYDRAULIC,FOR D 285.33 HR 0 0 1,978 0 1,978
<br />TRK,HWY,4X2,F250.3/4T,8600 GVW 0 .00 0.00 6.41 O. 00 6.41
<br />4X2 3/4-TON PICK-UP, 8600 GVW 142.67 HR 0 0 914 0 914
<br />
<br />23.41
<br />
<br />65.12
<br />
<br />6.93
<br />
<br />II
<br />
<br />6.41
<br />
<br />I
<br />
<br />LABOR ID: CIV'ITA
<br />
<br />EQUIP 1D; MR0054
<br />
<br />CUrrency in DOLLARS
<br />
<br />CREW 1D; MRONAT UPS 1D; MRON93
<br />
|