Laserfiche WebLink
<br />I <br />II <br /> <br />Fri 16 Jun 1995 <br />Eff. Date 03/21/95 <br /> <br />u. S. Army Corps of Engineers <br />PROJECT LANGA2; Langdon Bend Alternative A2 - Nemaha County. NE <br />FEASIBILITY ESTIMATE <br />PROJEeT OWNER SUMMARY - LEVEL 1 * * <br /> <br />TIME 14:23:51 <br /> <br />SUMMARY PAGE 1 <br /> <br />------------------------~------------------------------------------------------------------------------------------------------ <br /> <br />I <br /> <br />QUANTITY UOM <br /> <br />CONTRACT ESCALATN CONTINGN <br /> <br />E&D <br /> <br />S&A TOTAL COST UNIT COST <br /> <br />------------------------,------------------------------------------------------------------------------------------------------ <br /> <br />I <br /> <br />01 Lands and Damages 895,000 0 0 0 0 895,000 <br />06 Fish and Wildlife Fac:::ilities 1.00 EA 2,582,448 0 516,490 0 0 3,098,938 3098938 <br />30 Planning, Engineerin~ and Design 1. 00 EA 154.947 0 0 0 0 154,947 154947.00 <br />31 Construction Managem~nt 1. 00 EA 185,936 0 0 0 0 185,936 185936.00 <br /> ----------- --------- --------- --------- --------- ----------- <br /> Langdon Bend Alternative A2 1. 00 EA 3,818,331 0 516,490 0 0 4,334,821 4334821 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />LABOR 10: CIVTTA <br /> <br />EQUIp 10: MR0054 <br /> <br />Currency in DOLLARS <br /> <br />CRaW 10: MRONAT OPE 10: MRON93 <br />