My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01627
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01627
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 10:40:29 AM
Creation date
10/4/2006 10:11:24 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
Nemaha County Nebraska
Stream Name
Missouri River Miles 532.4-528.9
Title
Langdon Bend Habitat Restoration/Preservation Project Volume 3
Date
6/1/1995
Prepared For
US Army Corps of Engineers
Prepared By
Greenhorne & O'Mara, Inc.
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />Fri 16 Jun 1995 <br />Eff. Date 03/21/95 <br />DETAILED ESTIMATE <br /> <br />PROJECT LANGAl: <br /> <br />u. S. Army Corps of Engineers <br />Langdon Bend Alternative Al - Nemaha County. NE <br />FEASIBILITY ESTIMATE <br />30. Planning, Engineering and Design <br /> <br />TIME 14:22:01 <br /> <br />DETAIL PAGE 13 <br /> <br />I <br /> <br />------------------------------------------------------------------------------------------------------------------------------- <br /> <br />I <br /> <br />QUANTI UOM MANHOUR <br /> <br />LABOR EQUIPMNT MATERIAL TOTAL COST UNIT COST <br /> <br />------------------------------------------------------------------------------------------------------------------------------- <br /> <br />I <br /> <br />Planning, Engineering and Design <br />Planning Engineering and Design were assumed to be 5% of construction costs <br />based on the Corps' review comment number 60 which is included in the <br />supporting data to this report under separate cover. <br />TOTAL planning, Engineering and Design 1.00 EA <br /> <br />o <br /> <br />142,200 <br /> <br />o <br /> <br />o <br /> <br />142,200 142200.00 <br /> <br />I <br /> <br />I <br /> <br />Construction Management <br />Construction Management was assumed to be 6% of the construction costs <br />based on the project template sent by the corps. <br />TOTAL Construction Management 1.00 EA <br /> <br />o <br /> <br />170,640 <br /> <br />o <br /> <br />o <br /> <br />170,640 170640.00 <br /> <br />I <br /> <br />TOTAL Langdon Bend Alternative AI <br /> <br />1. 00 SA <br /> <br />18,299 1,707,877 <br /> <br />523,054 <br /> <br />820,155 <br /> <br />3,051,087 <br /> <br />3051087 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />LABOR In: C1VITA <br /> <br />EQUIP 10: MR0054 <br /> <br />CUrrency in DOLLARS <br /> <br />CREW 10: MRONAT <br /> <br />UPB 10: MRON93 <br />
The URL can be used to link to this page
Your browser does not support the video tag.