Laserfiche WebLink
<br />I <br /> <br />Fri 16 Jun 1995 <br />Eff. Date 03/21/95 <br />DETAILED ESTIMATE <br /> <br />u. S. Army Corps of Engineers <br />PROJECT LANGAl: Langdon Bend Alternative Al - Nemaha County, NE <br />FEASIBILITY ESTIMATE <br />06. Fish and Wildlife Facilities <br /> <br />TIME 14:22:01 <br /> <br />DETAIL PAGE 11 <br /> <br />I <br /> <br />------------------------------------------------------------------------------------------------------------------------------- <br /> <br />I <br /> <br />wildlife Facilities & Sanctuary <br /> <br />QUANTI UOM MANHOUR <br /> <br />LABOR EQUIPMN'I' MATERIAL TOTAL COST UNIT COST <br /> <br />------------------------------------------------------------------------------------------------------------------------------- <br /> <br />I <br /> <br />Foreman 1. 00 25.00 0.00 0.00 25.00 <br /> 272.00 HR 272 6,800 0 0 6,800 25.00 <br />LOR, FE, CRWLR, 2.00 CY 0.00 0.00 36.17 0.00 36.17 <br />REF, EP 1110-1-8 272.00 HR 0 0 9,838 0 9,838 36.17 <br />2.00 CY <br />OUtside Equip. Oilers 1.00 17.10 0.00 0 ,00 17.10 <br /> 272.00 HR 272 4,650 0 0 4,650 17.10 <br />Filter Material (delivered) 0.00 0.00 0.00 14.70 14.70 <br /> 6800.00 TON 0 0 0 99,960 99,960 14.70 <br />Outside Equip. Op, Heavy 1.00 23.41 0.00 0.00 23.41 <br /> 272.00 HR 272 6,368 0 0 6,368 23.41 <br /> --------- --------- --------- ----------- <br />TOTAL FILTER MATERIAL 6800.00 TON 1,036 22,968 27,196 99,960 150,124 22.08 <br />STRUCTURE RIPRAP <br />A crane with a 1.25cy bucket and a 2 cy FE loader will install the riprap <br />for all structures. Two laborers will be used to hand place the riprap at <br />a rate of 25 tons per hour. <br />OUtside Equip. Op, Heavy 1.00 23.41 0.00 0.00 23.41 <br /> 1444.00 HR 1,444 33,804 0 0 33,804 23.41 <br />CR,ME,CWLR,LIFTING,50T,W/50'BOOM 0.00 0.00 54.67 0.00 54.67 <br />50 TON LIFTING CRANE W/50' BOOM 1444.00 HR 0 0 78,949 0 78,949 54.67 <br />BKT,CLAM,1-1/8CY,GEN PURP/SQNOSE 0.00 0.00 2.73 0.00 2.73 <br />1.125 CY, GEN, PURPOSE/SQUARE NO 1444.00 HR 0 0 3,948 0 3,948 2.73 <br />TRK,HWY,4X2,F250,3/4T,8600 GVW 0.00 0.00 6.41 0.00 6.41 <br />4X2 3/4-TON PICK-UP, 8600 GVW 1444.00 HR 0 0 9,249 0 9,249 6.41 <br />Foreman 1.00 25.00 0.00 0.00 25.00 <br /> 1444.00 HR 1,444 36,100 0 0 36,100 25.00 <br />Outside Laborer (Semi-Skilled) 1.00 9.72 0.00 0.00 9.72 <br /> 2888.00 HR 2,888 28,062 0 0 28,062 9.72 <br />LOR,FE, CRWLR, 2.00 CY 0.00 0.00 36.17 0.00 36.17 <br />REF, EP 1110-1-8 1444.00 HR 0 0 52,230 0 52,230 36.17 <br />2.00 CY <br />OUtside Equip. Oilers 1. 00 17.10 0.00 0.00 17.10 <br /> 1444.00 HR 1,444 24,687 0 0 24,687 17.10 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />II <br />I <br /> <br />LABOR ID: CIVTI'A <br /> <br />EQUIP ID: MR0054 <br /> <br />CUrrency in DOLLARS <br /> <br />CREW In: MRONAT UPB In: MRON93 <br />