Laserfiche WebLink
<br />I <br /> <br />Fri 16 Jun 1995 <br />Eff. Date 03/21/95 <br />DETAILED ESTIMATE <br /> <br />u. S. Army corps of Engineers <br />PROJECT LANGAl: Langdon Bend Alternative A1 - Nemaha County, NE <br />FEASIBILITY ESTIMATE <br />06. Fish and Wildlife Facilities <br /> <br />TIME 14 :22: 01 <br /> <br />DETAIL PAGE 7 <br /> <br />I <br /> <br />------------------------------------------------------------------------------------------------------------------------------- <br /> <br />I <br /> <br />Wildlife Facilities & Sanctuary <br /> <br />QUANTY UOM MANHOUR <br /> <br />LABOR EQUIPMNT MATERIAL TOTAL COST UNIT COST <br /> <br />------------------------------------------------------------------------------------------------------------------------------- <br /> <br />I <br /> <br />Fish and Wildlife Facilities <br /> <br />wildlife Facilities & Sanctuary <br /> <br />I <br /> <br />CLEARING AND GRUBBING <br />Two DaN dozers <br />review comment <br /> <br />will be used to complete this work. <br />number 98 and discussions with Rich <br /> <br />Based on the Corps' <br />Stricker, this work will <br /> <br />I <br /> <br />be completed at a rate of 0.1 acres per hour. <br /> <br />I <br /> <br /> DOZER,CWLR,CAT 0-8N, (ADD BLADE) 0.00 0.00 65.12 0.00 65.12 <br /> POWERSHIFT , (ADD BLADE) 320.00 HR 0 0 20,840 0 20,840 65_12 <br /> BlADE, UNIVERSAL,HYDR,FOR 08 0.00 0 ,00 6.93 0.00 6.93 <br /> BlADE, UNIVERSAL, HYDRAULIC, FOR D 320.00 HR 0 0 2,218 0 2,218 6.93 <br /> TRK,HWY,4X2,F250,3/4T,8600 GVW 0.00 0.00 6.41 0.00 6.41 <br /> 4X2 3/4-TON PICK-UP, 8600 GVW 160.00 HR 0 0 1,025 0 1,025 6.41 <br /> Foreman 1. 00 25.00 0.00 0.00 25.00 <br /> 160.00 HR 160 4,000 0 0 4,000 25.00 <br /> OUtside Laborer (Semi-Skilled) 1.00 9.72 0.00 0.00 9.72 <br /> 320.00 HR 320 3,109 0 0 3,109 9.72 <br /> CHAINSAW, 31" BAR 0.00 0.00 1.55 0.00 1.55 <br /> CHAINSAW - 31" BAR 320.00 HR 0 0 497 0 497 1. 55 <br /> OUtside Equip. Op, Heavy 1. 00 23.41 0.00 0.00 23_41 <br /> 320.00 HR 320 7,491 0 0 7,491 23.41 <br /> --------- --------- --------- ----------- <br />TOTAL CLEARING AND GRUBBING 16.00 AC 800 14,601 24,580 0 39,181 2448.80 <br />STRIP & STOCKPILE TOPSOIL <br /> Two D8N dozers will complete this work at a rate of 225cy per hr. The <br /> material will be pushed off the the side and stockiled for use later. <br /> OUtside Equip. Op, Heavy 1. 00 23.41 0.00 0.00 23.41 <br /> 233.78 HR 234 5,473 0 0 5,473 23.41 <br /> DOZER,CWLR,CAT D-8N, IADD BLADE) 0.00 0.00 65.12 0.00 65.12 <br /> POWERSHIFT , (ADD BLADE) 233.78 HR 0 0 15,225 0 15,225 65.12 <br /> BLADE, UNIVERSAL, HYDR, FOR D8 0.00 0.00 6.93 0.00 6.93 <br /> BLADE, UNIVERSAL,HYDRAULIC, FOR D 233.78 HR 0 0 1,621 0 1,621 6.93 <br /> TRK,HWY,4X2,F250,3/4T, 8600 GVW 0.00 0.00 6.41 0.00 6.41 <br /> 4X2 3/4-TON pICK-UP, 8600 GVW 116.89 HR 0 0 749 0 749 6.41 <br /> Foreman 1.00 25.00 0.00 0.00 25.00 <br /> 116_89 HR 117 2,922 0 0 2,922 25.00 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />IABOR ID: CIV'ITA <br /> <br />EQUIP ID: MR0054 <br /> <br />Currency in DOLlARS <br /> <br />CREW ID: MRONAT UPE ID: MRON93 <br />