<br />I
<br />
<br />Fri 16 Jun 1995
<br />Eff. Date 03/21/95
<br />DETAILED ESTIMATE
<br />
<br />u. S. Army corps of Engineers
<br />PROJECT LANGAl: Langdon Bend Alternative A1 - Nemaha County, NE
<br />FEASIBILITY ESTIMATE
<br />06. Fish and Wildlife Facilities
<br />
<br />TIME 14 :22: 01
<br />
<br />DETAIL PAGE 7
<br />
<br />I
<br />
<br />-------------------------------------------------------------------------------------------------------------------------------
<br />
<br />I
<br />
<br />Wildlife Facilities & Sanctuary
<br />
<br />QUANTY UOM MANHOUR
<br />
<br />LABOR EQUIPMNT MATERIAL TOTAL COST UNIT COST
<br />
<br />-------------------------------------------------------------------------------------------------------------------------------
<br />
<br />I
<br />
<br />Fish and Wildlife Facilities
<br />
<br />wildlife Facilities & Sanctuary
<br />
<br />I
<br />
<br />CLEARING AND GRUBBING
<br />Two DaN dozers
<br />review comment
<br />
<br />will be used to complete this work.
<br />number 98 and discussions with Rich
<br />
<br />Based on the Corps'
<br />Stricker, this work will
<br />
<br />I
<br />
<br />be completed at a rate of 0.1 acres per hour.
<br />
<br />I
<br />
<br /> DOZER,CWLR,CAT 0-8N, (ADD BLADE) 0.00 0.00 65.12 0.00 65.12
<br /> POWERSHIFT , (ADD BLADE) 320.00 HR 0 0 20,840 0 20,840 65_12
<br /> BlADE, UNIVERSAL,HYDR,FOR 08 0.00 0 ,00 6.93 0.00 6.93
<br /> BlADE, UNIVERSAL, HYDRAULIC, FOR D 320.00 HR 0 0 2,218 0 2,218 6.93
<br /> TRK,HWY,4X2,F250,3/4T,8600 GVW 0.00 0.00 6.41 0.00 6.41
<br /> 4X2 3/4-TON PICK-UP, 8600 GVW 160.00 HR 0 0 1,025 0 1,025 6.41
<br /> Foreman 1. 00 25.00 0.00 0.00 25.00
<br /> 160.00 HR 160 4,000 0 0 4,000 25.00
<br /> OUtside Laborer (Semi-Skilled) 1.00 9.72 0.00 0.00 9.72
<br /> 320.00 HR 320 3,109 0 0 3,109 9.72
<br /> CHAINSAW, 31" BAR 0.00 0.00 1.55 0.00 1.55
<br /> CHAINSAW - 31" BAR 320.00 HR 0 0 497 0 497 1. 55
<br /> OUtside Equip. Op, Heavy 1. 00 23.41 0.00 0.00 23_41
<br /> 320.00 HR 320 7,491 0 0 7,491 23.41
<br /> --------- --------- --------- -----------
<br />TOTAL CLEARING AND GRUBBING 16.00 AC 800 14,601 24,580 0 39,181 2448.80
<br />STRIP & STOCKPILE TOPSOIL
<br /> Two D8N dozers will complete this work at a rate of 225cy per hr. The
<br /> material will be pushed off the the side and stockiled for use later.
<br /> OUtside Equip. Op, Heavy 1. 00 23.41 0.00 0.00 23.41
<br /> 233.78 HR 234 5,473 0 0 5,473 23.41
<br /> DOZER,CWLR,CAT D-8N, IADD BLADE) 0.00 0.00 65.12 0.00 65.12
<br /> POWERSHIFT , (ADD BLADE) 233.78 HR 0 0 15,225 0 15,225 65.12
<br /> BLADE, UNIVERSAL, HYDR, FOR D8 0.00 0.00 6.93 0.00 6.93
<br /> BLADE, UNIVERSAL,HYDRAULIC, FOR D 233.78 HR 0 0 1,621 0 1,621 6.93
<br /> TRK,HWY,4X2,F250,3/4T, 8600 GVW 0.00 0.00 6.41 0.00 6.41
<br /> 4X2 3/4-TON pICK-UP, 8600 GVW 116.89 HR 0 0 749 0 749 6.41
<br /> Foreman 1.00 25.00 0.00 0.00 25.00
<br /> 116_89 HR 117 2,922 0 0 2,922 25.00
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />IABOR ID: CIV'ITA
<br />
<br />EQUIP ID: MR0054
<br />
<br />Currency in DOLlARS
<br />
<br />CREW ID: MRONAT UPE ID: MRON93
<br />
|