Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Arvada, City of, "Comprehensive Plan," August 1979. <br /> <br />Robert Snow Means Company, Inc., "1983 Means Building Construction Cost <br /> <br />Data," 1982. <br /> <br />Centennial Engineering, Inc., "Design Report, Ralston Road Extension, <br />Wadsworth Bypass to Sheridan Blvd.," September 1984. <br /> <br />U. S. Army Corps of Eng ineers, Hydrol og ic Eng ineeri ng Center," HEC-2, Water <br />Surface Profiles, Users Manual," September 1982. <br /> <br />Chow, Ven Te, "Open Channel Hydraul ics," McGraw-Hill Book Company, New <br />York, 1959. <br /> <br />Contra, Ltd., "Major Drainageway Design, Twin Creek Homes," March 1984. <br /> <br />U.S. Department of Agriculture, Soil Conservation Service, "Inventory and <br />Evaluation of Soils," in cooperation with Jefferson Soil Conservation <br />District, May 1983. <br /> <br />Frasier & Gingery, Inc., "Van Bibber Creek, Major Drainageway Planning, <br />Interim Report, Phase A," December 1974. <br /> <br />U.S. Department of Commerce, Bureau of Publ ic Roads, "Hydraul ic Engineering <br />Circular No.5," April 1964. <br /> <br />Gingery Associates, Inc., "Major Drainageway Planning, Van Bibber Creek," <br />March 1977. <br /> <br />U.S. Department of the Interior, Bureau of Reclamation, "Design of Small <br />Dams," 1977. <br /> <br />Gingery Associates, Inc., "Feasibility Investigation, Van Bibber Detention <br />Facility," January 1981. <br /> <br />U. S. Department of the Interior, Geologic Survey, "Measurement of Peak <br />Discharge at Culverts by Indirect Methods," 1968. <br /> <br />Gingery Associates, Inc., "Van Bibber Creek - Benefit-Cost Analysis for <br />Three Alternatives for Major Drainageway Improvements ," January 1983. <br /> <br />Urban Drainage and Flood Control District, "Methodology for Ev al uation of <br />Feasibility: Multijurisdictional Urban Drainage and Flood Control Pro- <br />jects," February 1977. <br /> <br />Hydro-Triad, Ltd., "Modification to the Ralston Creek Floodplain," March <br />1983. <br /> <br />Wright-McLaughl in Engineers, "Urban Storm Drainage, Criteria Manual, <br />Vol urnes 1 and 2," March 1969. <br /> <br />Jefferson County, "Land Development Regul ations," January 1982. <br /> <br />Jefferson County, "Zoning Resolution," January 1983. <br /> <br />Wright-McLaughl in Engineers, "Ralston Creek and Leyden Creek, Phase A, <br />Development of Alternate Plans," May 1976. <br /> <br />Muller Engineering Co., Inc., "Van Bibber Creek, Oak Street to Kipling <br />Street, Floodplain Map Pmendment," July 1982. <br /> <br />Wright-McLaughlin Engineers, "Major Drainageway Planning, Ralston/Leyden <br />Creek," September 1977. <br /> <br />Resource Analysis, "MITCAT, A Hydrologic Simul ation Model, Users Manual," <br />March 1980. <br /> <br />Wright-McLaughl in Engineers, "Major Drainageway Pl anning, Lower Cl ear <br />Creek, Phase B," October 1981. <br /> <br />Wright Water Engineers, "Major Drainageway Pl anning, Lower Ral ston/Van <br />Bibber/Leyden Creek, Phase B Report" March 1984. <br />