My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01585
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01585
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:02:50 PM
Creation date
10/4/2006 10:08:00 PM
Metadata
Fields
Template:
Floodplain Documents
County
El Paso
Community
Colorado Springs
Stream Name
Arkansas River
Title
El Paso County Floodplain Zoning/Insurance/Information
Date
4/1/1973
Prepared For
El Paso County
Prepared By
El Paso County Planning Office
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />grading, channel improvement, storage <br />of materials, water supply and sanitary <br />facilities. <br /> <br />1) Modification of waste disposal and water supply <br />facilities. <br /> <br /> <br />C. The County Planning Commission May Recommend Such <br />and the County Commissioners May Attach Any of the <br />Following Conditions to the Granting of a Use <br />Requiring Approval of Location or Any Other Condi- <br />tion as it Deems Necessary to Further the Purpose <br />of This Section. <br /> <br />2) Limitations on periods of use and operation. <br /> <br />3) Imposition of operational control, sureties <br />and deed restrictions. <br /> <br />4) Requirements for construction of channel modifi- <br />cations, dikes, levees and other protective <br />measures. <br /> <br />5) Flood proofing measures, such as the following: <br /> <br />a. Anchorage to resist flotation and lateral <br />movement. <br /> <br />b. Installation of watertight doors, bulkheads, <br />and shutters. <br /> <br />c. Reinforcement of walls to resist water pres- <br />sures. <br /> <br />d. Use of paints, membranes, or mortars to reduce <br />seepage of water through walls. <br /> <br />e. Addition of mass or weight to structures to <br />resist flotation. <br /> <br />f Installation of pumps to lower water levels <br />in structures. <br /> <br />g. Construction of water supply and waste treat- <br />ment systems so as to prevent the entrance of <br />flood waters. <br /> <br />h. Pumping facilities for subsurface external <br />foundation wall and basement floor pressures. <br /> <br />i. Cortstruction to resist rupture or collapse <br />caused by water pressure or floating debris. <br /> <br />j. Cutoff valves on sewer lines or the elimination <br />of gravity flow basement drains. <br /> <br />k. Elevation of structures and uses to the Inter- <br />mediate Regional Flood protection elevation. <br />- 25 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.