Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />PUEBLO FLOOD INSURANCE STUDY <br />TEXT REVISION <br /> <br />Section 1.2 <br /> <br />. <br /> <br />. <br /> <br />Expand section to include coordination with the following <br />organizations: <br /> <br />Albuquerque District, U.S. Army Corps of Engineers <br />U.S.G.S. <br />City of Pueblo <br />Pueblo County <br />NOAA <br />Soil Conservation Service <br />KLH Engineers <br />Sellards and Grigg Consultants, Inc. <br />CF & I Steel Corporaion <br />Dames and Moore Consultants, Inc. <br />Colorado Department of Highways <br /> <br />Add statement that the 1977 COE Flood Insurance Study was <br />unacceptable to the City of Pueblo. <br /> <br />Add statement that this FIS revision was performed by MSM <br />Consultants, Inc., Denver, Colorado. The initial <br />coordination meeting was held on August 5, 1980 with MSM <br />Consultants, FIHM, and officials of City & County of Pueblo. <br /> <br />Section 1.3 <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />Expand Section to include rev~s~on by MSM Consultants, Inc., <br />Denver, Colorado under contract H-4710 Modification 4 and <br />completed in March 1981. <br /> <br />Section 2.1 <br /> <br />. <br /> <br />Expand Section to include approximate study on Arkansas <br />River from upstream limit of detailed study to western <br />corporate limit. Approximate study on Easst Dry Creek from <br />upstream limit of detailed study to upstream face of Highway <br />47. <br /> <br />Section 2.3 <br /> <br />. <br /> <br />Expand section for <br />frequency of 1965 <br />technical report. <br /> <br />Lake <br />flood <br /> <br />Minnequa using <br />as described <br /> <br />description <br />in attached <br /> <br />and <br />MSM <br /> <br />-22- <br /> <br />. <br />