My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01468
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01468
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 12:58:17 PM
Creation date
10/4/2006 10:03:31 PM
Metadata
Fields
Template:
Floodplain Documents
County
Park
Community
Fairplay
Title
Flood Plain Information Report Town of Fairplay
Date
9/9/1998
Prepared For
Fairplay
Prepared By
CWCB
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />FLOODPLAIN MANAGEMENT <br /> <br />Local Ordinance/Statutory Requirements <br /> <br />Communities that manage their floodplains in Colorado do so most often through the local <br />regulatory process. This requires a community to adopt an ordinance or regulation that sets forth <br />the performance standards by which development will occur in identified flood hazard areas, <br />Nationwide and in Colorado, regulations are enforced within the area of the lOO-year floodplain, <br /> <br />The basic requirement of these regulations is that new development and significant improvement of <br />existing development cannot occur in the lOO-year floodplain without a floodplain development <br />permit being obtained. Obtaining such a permit requires compliance with engineering standards. <br />In communities like Fairplay that have no detailed floodplain information with water surface <br />elevations, the engineering ..s!an<!a,rds..are general. Structures must be built with materials and <br />techniques that " inirriiZe flood danlage," In communities that have detailed floodplain <br />information the standards require that residential buildings must be elevated above the I OO-year <br />elevation and that non-residen buildings must be either elevated or floodproofed, Other <br />structures or projects (i,e, bridges culverts or fill) must be constructed in a way that minimizes the <br />potential increase in flood elevati ns they may cause, <br /> <br />'40 <br /> <br />Flood Insurance <br /> <br />Flood insurance is made available to owners and occupants of floodprone property through the <br />federal govemment's National Flood Insurance Program (NFIP), The NFIP insurance is available <br />to anyone in any community that participates in the NFIP. At the time of this publication, Fairplay <br />was participating in the NFIP. Communities that are participants have adopted floodplain <br />regulations and an NFIP map (if one exists) and have agreed to cooperate with the federal <br />government in the local implementation of the NFIP, Property owners and occupants can then <br />contact an insurance agent familiar with the NFIP (perhaps their own agent) and purchase insurance <br />through that agent, much like they would purchase homeowner's insurance. Brochures and other <br />information regarding the National Flood Insurance Program can be obtained by calling the <br />Regional Office of the Federal Emergency Management Agency (FEMA) in Denver at (303) 235- <br />4830, <br /> <br />Floodnlain Manal!ement Alternatives <br /> <br />Besides floodplain regulations and flood insurance, there are many actions that can reduce the risk <br />of flood damage in a community. Generally these actions fall into two classes, structural actions <br />and non-structural actions, Structural actions involve the construction of facilities to separate <br />floodwaters from property that is at risk. They include construction of improved channels, <br />enlargement of crossing structures (bridges and culverts), levees and floodwalls, reservoirs and <br />ponds to detain floodwaters and diversion channels and pipes to direct waters elsewhere. Non- <br />structural actions usually involve reIJl9y.~.fileople and/or structures from the risk without <br />physically altering the floodplain,I~Ciloi1SiiiClude regulation of new development, the adoption <br />^ <br />
The URL can be used to link to this page
Your browser does not support the video tag.