Laserfiche WebLink
<br /> I <br /> I <br />5,0 IDENTIFICATION AND EVALUATION OF PLAN COMPONENTS 5-1 <br /> 5,1 INTRODUCTION 5-1 I <br /> 5,2 NON-STRUCTURAL COMPONENTS 5-2 <br /> 5,2.1 Water Management and Conservation Measures 5-2 I <br /> 5.2,2 Recreation Components 5-4 <br /> 5,3 STRUCTURAL COMPONENTS 5-4 I <br />6.0 IN-BASIN DEVELOPMENT PLAN FORMULATION AND EVALUATION 6-1 <br /> 6.1 PLAN FORMULATION 6-1 I <br /> 6.2 PLAN EVALUATION 6-1 <br /> 6.3 SCREENING OF ALTERNATIVE PLANS 6-5 I <br />7.0 FINANCIAL ANALYSIS OF PREFERRED PLAN 7-1 I <br /> 7,1 INTRODUCTION 7-1 <br /> 7.2 SOURCES OF FUNDING AND RESULTING ANNUAL COSTS 7-1 I <br /> 7,3 SOURCES AND AMOUNT OF DIRECT PROJECT INCOME 7-2 <br /> 7,4 OTHER PROJECT BENEFITS 7-3 <br /> 7.4.1 Economic Impact of Increased Tourism 7-3 I <br /> 7.4,2 Environmental Indirect Benefits 7-3 <br /> . I <br /> 7.4,3 Flood Protection Benefits 7-4 <br /> 7.5 POTENTIAL SOURCES OF SUPPLEMENTAL INCOME 7-4 <br />8.0 POTENTIAL FINANCIAL ENHANCEMENT 8-1 I <br /> 8,1 INTRODUCTION 8-1 I <br /> 8.2 PUMPED STORAGE HYDROELECTRIC POWER GENERATION 8-1 <br /> 8.3 OUT OF BASIN WATER SALES 8-3 I <br /> 8.3.1 Introduction 8-3 <br /> 8.3.2 Methodology and Assumptions 8-4 <br /> 8.3.3 Modified Central Colorado Project 8-5 I <br /> 8.3.4 Taylor Park Project 8-6 <br /> 8.3.5 Collegiate Range Project 8-9 I <br /> 8.3.6 Union Park Project 8-9 <br /> 8,3.7 Value of Water 8-10 I <br /> 8.3.8 Conclusion 8-10 <br /> I <br /> -2- I <br /> ~,.. <br />