My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01459
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01459
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:07:19 PM
Creation date
10/4/2006 10:03:03 PM
Metadata
Fields
Template:
Floodplain Documents
County
Gunnison
Community
Uncompahgre Valley
Title
Upper Gunnison-Uncompahgre Basin Phase 1 Feasibility Study Summary Report
Date
5/1/1989
Prepared For
Colorado Water Resources and Power Development Authority
Prepared By
HDR Engineering, Inc.
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />5-8 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Prel iminary eval uat ion of these components resulted in retaining the Ohio <br />Creek site, the two Cochetopa sub-basin sites, and two of the five sites in <br />the Tomichi sub-basin; Sargents No. 3 and Elko. The two Cochetopa sites and <br />the two Tomichi sites that were retained for further study exhibit advantages <br />and disadvantages that make a definite choice between them very difficult at <br />this level of study. <br /> <br />The major project features and prel iminary cost estimates for each of <br />these five potential storage reservoirs is presented in Table 5.3. All of <br />these potential reservoirs would be formed by earthfill embankment dams with <br />ungated spillways and mult il evel outl et works. Prelimi nary project 1 ayout <br />drawings are shown in Figures 5.2 through 5.6. <br />
The URL can be used to link to this page
Your browser does not support the video tag.