My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01459
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01459
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:07:19 PM
Creation date
10/4/2006 10:03:03 PM
Metadata
Fields
Template:
Floodplain Documents
County
Gunnison
Community
Uncompahgre Valley
Title
Upper Gunnison-Uncompahgre Basin Phase 1 Feasibility Study Summary Report
Date
5/1/1989
Prepared For
Colorado Water Resources and Power Development Authority
Prepared By
HDR Engineering, Inc.
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />in the model. Decrees which are located on small headwaters streams where <br />they woul d not have any impact on exi st ing or proposed water development <br />projects were not modeled. <br /> <br />There are several privately held instream flow decrees in the Upper <br />Gunnison basin. The Rocky Mountain Biological Laboratory (RMBL) holds a group <br />of non-consumptive instream flow and minimum lake level rights upstream of <br />Gothic on the East River and its tributaries. The CWCB also holds instream <br />flow rights on some of the same stream reaches. These rights were not modeled <br />since they are located upstream of any existing or proposed developments <br />considered in the study and therefore will not affect or be affected by <br />potential development plans considered in the study. <br /> <br />The Taylor Park Pool Association (composed of local ranchers and <br />landowners in the Taylor Park area) hold non-consumptive water rights on the <br />Taylor Ri ver and its tri butaries from Lotti s Creek upstream. These water <br />rights have been adjudicated but their legal status is somewhat unclear since <br />C.R.S. 37-92-102(3) implies that only the State is empowered to appropriate <br />water for i nstream flows. Furthermore, because these decrees are pri vately <br />held, the possibility exists that they could be sold or ~bandoned. The legal <br />issues involved in such a sale or abandonment are not well defined. Despite <br />these uncerta i nt i es, it was decided that the pri vate ly hel d decrees located <br />where future water development coul d be impacted shoul d be i ncl uded in the <br />model since they have been adjudicated. The decrees included in the model are <br />listed in Table 3.1. <br /> <br />3-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.