My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01405
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01405
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2010 10:11:47 AM
Creation date
10/4/2006 9:59:38 PM
Metadata
Fields
Template:
Floodplain Documents
County
Jefferson
Arapahoe
Community
Jefferson County, Arapahoe County
Stream Name
Massey Draw, North Tributary SJCD
Title
Major Drainageway Planning
Date
7/1/1979
Prepared For
Jefferson County / Adams County
Prepared By
UDFCD
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />Sheet <br />No. <br /> <br />12 <br />13 <br /> <br />14 <br /> <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br /> <br />LIST OF DRAWINGS - CONT. <br /> <br />1. INTRODUCTION <br /> <br />10 <br />11 <br /> <br />Title <br />NORTH TRIBUTARY MASSEY DRAW - Cont. <br />Plan and Profile <br />Plan and Profile <br /> <br />This is the final report of a major drainageway planning study for Massey Draw, <br /> <br /> <br />the North Tributary of Massey Draw, SJCD (South) - Basin 6200 and two of its <br /> <br />tributaries. The basins are shown on Sheet 1 of the Drawings. The study was <br /> <br /> <br />authorized by an agreement between the Urban Drainage and Flood Control District <br /> <br /> <br />(UDFCD), Jefferson County, Arapahoe County, and Leonard Rice Consulting Water <br /> <br /> <br />Engineers, Inc. (LRCWE) dated March 16, 1977. Mapping of the drainageways was <br /> <br /> <br />accomplished under separate contract between the UDFCD and Delta Aerial Surveys. <br /> <br /> <br />The lower pDrtion of the SJCD (South) Basin including its North Tributary was <br /> <br /> <br />included in a previous master plan (1)* prepared by CH2M-Hill, Inc. in July 1976. <br /> <br />The present study supersedes the CH2M-Hill, Inc. study for the lower reaches <br /> <br /> <br />of SJCD (South) - Basin 6200. Other reports completed under the present pro- <br /> <br /> <br />ject includ~ th~ Phase A Major Drainageway Planning Report (2) published in 11arch <br /> <br /> <br />1978, and the Flood Hazard Area Delineation Report (3) published in 11ay 1978. <br /> <br />Station <br /> <br />Authorization <br /> <br />30+00 to 60+00 <br />0+00 to 30+00 <br /> <br />TRIBUTARY NO. 1 SJCD (SOUTH) - BASIN 6200 <br />Plan and Profile <br />Plan and Profile <br /> <br />30+00 to 62+00 <br />0+00 to 30+00 <br /> <br />TRIBUTARY NO. 2 SJCD (SOUTH) - BASIN 6200 <br /> <br />Plan and Profile <br /> <br />0+00 to 30+00 <br /> <br />SJCD ( SOUTH) - BASIN 6200 <br />Plan and Profile <br />Plan and Prof ile <br />Plan and Profile <br />Plan and Profile <br />Plan and Profile <br />Plan and Profile <br />Plan Only <br />Plan and Profile <br />Plan Only <br />Plan and Profile <br /> <br />221-+-00 to 251+00 <br />191-+-00 to 221+00 <br />161-+-00 to 191+00 <br />131+00 to 161+00 <br />101-+-00 to 131+00 <br />71+00 to 101+00 <br />54+70 to 71+00 <br />28+70 to 54+70 <br /> <br />Purpose and Scope <br /> <br />The Phase A report defined major drainage considerations for each basin, identi- <br /> <br /> <br />fied existing and potential flood hazard problems, and developed and evaluated <br /> <br /> <br />flood contrDl alternatives and recommended one plan. The Flood Pazard <br /> <br />Area Delineation Report defined the 100 year flood plains and floodways which <br /> <br /> <br />together with adequate regulation of an effective flood plain regulation, will <br /> <br /> <br />prevent unwise development in the flood plains. <br /> <br />Following public hearings and approval by the UDFCD and Jefferson and Arapahoe <br /> <br /> <br />Counties, this Phase B report was authorized. The recommended plan of the Phase <br /> <br /> <br />A report was approved essentially as presented. In the Phase B study, prelimin- <br /> <br /> <br />ary design of the recommended plan Was accomplished. Master planning drawings <br /> <br /> <br />and cost estimates are included with this report, and copies of all backup data <br /> <br /> <br />are on file with the UDFCD. <br /> <br />The scope of work for this phase includes the following: <br /> <br />1. Review of the results of the Phase A and Flood Hazard Area Delinea- <br /> <br />2. <br />3. <br /> <br />tion studies; <br />Preparation of final hydrologic studies; <br />Preliminary design of the recommended alternativ~; <br />parenthesis refer to the list of references, Chapter VI. <br />Leonard Rice Consulting Water Engineers, Inc. <br /> <br />*Numbers in <br /> <br />C\) <br />
The URL can be used to link to this page
Your browser does not support the video tag.