Laserfiche WebLink
<br />5,2 Study Contractor <br /> <br />1. Assemble all available data from all sources as identified <br />in the document: Reconnaissar~f.."'c,.___B..~lrt Surface and <br />Subsurface Floodinq for Town _2L_ San Luis. ColOFdQQL <br />Colorado Water Conservation BoardL_p_EeJ:lVeL. Col.orado,-AIl!:lust <br />20, 1987, <br /> <br />2 . <br /> <br />Review the Work Pr'oject Administration (WPA) <br />and determine if it is still functioning, If <br />is still operating, determine feasibility of <br />new areas of town into old drain system, <br /> <br />drain project <br />the ,iPA drain <br />incorporating <br /> <br />], Develop street drainage maps for the incorporated limits of <br />San Luis, <br /> <br />4. Request the Army Corps of Engineers to certify the existing <br />levee constructed during 1979, <br /> <br />5, Investigate the three county road crossings at the Corps of <br />Engineers levee and provide cost estimates for road <br />closures and crossings at the three locations, Investigate <br />the possibility of incorporating t",o of the crossings into <br />one crossing at one location, <br /> <br />-15- <br />