<br />Table 5.1 Cost Estimate for Godding Hollow Basin.
<br />
<br /> Proposed Engineering,
<br />Reach- Description Improvementsi Property Permitting, Total Cost
<br />Item General Drainage Acquisition Legal &
<br /> Infrastructure Admin.
<br />G1-1 Channel Improvements $2,651,000 $317,000 $530,000 $3,498,000
<br />Gl-2 Replacement of WCR 26 Crossing $810,000 $162,000 $972,000
<br />Gl-3 Last Chance Ditch Realignment and Siphon $86,000 $11,000 $17,000 $114,000
<br /> Reach G1 Subtatal $4,584,000
<br />G2-1 Lake to Lake Transition $145,000 $4,000 $29,000 $178,000
<br /> Reach G2 Subtotal $178,000
<br />G3-1 Channel Improvements $3,718,000 $390,000 $744,000 $4,852,000
<br />03-2 Replacement of WCR 24 Crossing $470,000 $94,000 $564,000
<br />03-3 Replacement of WCR 22 Crossing $648,000 $130,000 $778,000
<br /> Reach G3 Subtotal $6,194,000
<br />G4-1 Replacement of WCR 20 Crossing $1,229,000 $246,000 $1,475,000
<br /> Reach G4 Subtotal $1,475,000
<br />G5-1 Replacement of WCR 18 Crossing $729,000 I $146,000 $875,000
<br />G5-2 1-25 and WCR 18 Detention Pond $580,000 $20,000(1) $600,000
<br /> Reach G5 Subtotal $1,475,000
<br />G6-1 Replacement of WCR 16 Crossing $712,000 I $142,000 $854,000
<br /> Reach G6 Subtotal $854,000
<br />G7-1 Replacement of State Highway 52 Crossing $1,008,000 $202,000 $1,210,000
<br />G7-2 State Highway 52 Detention Pond $510,000 $20,000(1) $530,000
<br />G7-3 Coalridge Ditch Realignment $106,000 $21,000 $127,000
<br /> Reach G7 Subtotal $1,867,000
<br />G8-1 Replacement of WCR 12 Crossing $400,000 $80,000 $480,000
<br />G8-2 Detention Pond $272,000 $170,000 $54,000 $496,000
<br /> Reach G8 Subtotal $976,000
<br />G9-1 Replacement of WCR 10 Crossing $134,000 $27 ,000 $161,000
<br />G9-2 UPRR Detention Pond $32,000 $100,000 $6,000 $138,000
<br />G9-3 UPRR Spur Detention Pond $220,000 $50,000 $44,000 $314,000
<br /> Reach G9 Subtotal $613,000
<br />G1O-1 West Tributary Detention Pond $379,000 $400,000 $76,000 $855,000
<br />GlO-2 Channel Construction $297,000 $70,000 $59,000 $426,000
<br /> Reach GlO Subtotal $1,281,000
<br /> Godding Hollow Basin Total Cost $19,497,000
<br />
<br />(I) Only legal and administrative costs are estimated for this improvement.
<br />
<br />T:IOPENlCoweldOllcoweldOlrbl5-Irev. wpd
<br />
<br />5.31
<br />
<br />September 7, 1999