Laserfiche WebLink
<br />within five days. However, it was assumed that there was no <br />discharge through the outlet works when passing the IDF <br />through Cherry Creek Dam, since the gates are normally closed <br />and the peaking time of runoff from the upstream basin is <br />short. <br /> <br />Table 4 <br />IDF Peak Discharges and <br />Maximum Water Surface Elevations <br /> <br />unit Graph <br />% Peaked <br />o <br />25 <br />50 <br /> <br />IDF <br />Peak Inflow <br />Cc.f.s.l <br />632,000 <br />714,000 <br />780,000 <br /> <br />Max Water <br />Surface Elevation <br />Cm.s.l.l <br />5657.8 <br />5657.8 <br />5657.7 <br /> <br />IDF <br />Peak Outflow <br />Cc.f.s.l <br />86,800 <br />86,500 <br />86,100 <br /> <br />9 <br />