Laserfiche WebLink
<br />~ <br />~ (weE> <br /> <br />That issue and the issue of appropriate additional requirements for <br />flood prone prClperties being annexed into Fairplay will be <br />addressea shortl1; as it is critical in a town facing new development <br />that those requirements be in place and be enforced. <br /> <br />River Restoration <br /> <br />Finally the town was encouraged to visit the Town of Breckenridge <br />to learn as much as possible about the restoration of the Blue <br />River. Fairplay is considering some kind of restoration of their river, <br />and it would be both easy and instructive to drive over Hoosier <br />Pass to see an actual restoration project. <br /> <br />Proposed Desi!:mation Action <br /> <br />The current designation action will address two existing maps. The <br />approximate information for the Middle Fork of the South Platte <br />River, as shown on the 1986 Fairplay FIRM, will be proposed for <br />designation as approximate floodplain information. The <br />approximate information for Beaver Creek, as shown on part of the <br />1977 Park County FHBM, will also be proposed for designation as <br />approximate floodplain information. <br /> <br />Recommendations for Floodplain Mappina <br /> <br />The following recommendations were made with regard to <br />floodplain mapping to be performed as part of the ongoing master <br />drainage plan work: <br /> <br />October 20, 1998 <br /> <br />1) Approximate floodplain mCWRing for the Middle Fork of <br />the South Platte RiverlA-~ JOe ~ i <br />~Q,.,~ <br />2) Detailed floodplain mapping for Beaver Creek within the <br />current corporate limits; <br />~ C{)~.Q,e ~ <br />3) Detailed or approximate floodplain mappin\lt for Beaver <br />Creek from the current downstream corporate limits <br />downstream to the confluence with the river (perhaps <br />detailed mapping should be performed by any <br />developers); <br /> <br />~Q,e~ <br />4) Approximate floodplain mapping/or Beaver Creek from <br />the current upstream corporate limits upstream to the flow <br />split in Section 28. <br /> <br />3 <br />