Laserfiche WebLink
<br /> <br /> <br />Figure 24. Looking upstream from left bank before the flow of January 8, 1993, New River <br />above Interstate 17 (site 8). <br /> <br /> <br />Figure 25. Looking upstream from left bank after the flow of January 8, 1993, New River <br />above Interstate 17 (site 8). <br /> <br />40 Method to Estimate Effects of Flow-Induced Vegetation Changes on Channel Conveyances of Streams in Central Arizona <br />