Laserfiche WebLink
<br /> Table 8. Bed-material, shear-stress, and flow-duration components determined for sites in centrai Arizona <br /> [lb/W, pound per foot squared; s, seconds; N/A, not available; ---. no data] <br /> Median diameter Ratio of shear <br /> (ds.) stress to <br /> Critical critical <br /> Shear shear shear stress <br /> Site stress stress tolte Estimated Vege- <br /> "urn- Vegetation Mil/i- ta tc (dlmen- flow duration tation <br /> ber type meters Feel (Ib/ft") (lblIt2) sionless) (s) removed <br /> I. Brush ............... 110 0.36 0.51 1.40 0.36 (') No <br /> Ib Brush .....,......... 110 .36 1.07 1.40 .76 No <br /> Ie S.ltcedar .......... 110 .36 1.54 1.40 1.10 14,400 No <br /> 2. Brush ............... 88 .29 .53 1.12 .47 No <br /> 2b Brush ............... 88 .29 .59 1.12 .53 No <br /> Do. 88 .29 .59 1.12 .53 No <br /> 3 Brush ............... 'N/A 'N/A .45 No <br /> 4 S.lteedar .......... 85 .28 .97 1.08 .90 No <br /> 5. Brush ............... 88 .29 1.27 1.12 1.13 3,600 No <br /> Saltcedar .......... 88 .29 1.27 1.12 1.13 3,600 No <br /> 5b Saltcedar .......... 88 .29 .83 1.12 .74 No <br /> Palo verde ,....... 88 .29 .83 1.12 .74 No <br /> 6 Brush ............... 94 .31 1.73 1.19 1.45 14,400 No <br /> Willow............. 94 .31 1.73 1.19 1.45 14,400 No <br /> 7 Brush ............... 100 .33 2.02 1.27 1.59 3,600 Yes] <br /> Palo verde ,....... 100 .33 2.02 1.27 1.59 3,600 No <br /> 8 Brush ............... 150 .49 2.68 1.90 1.41 5,400 Yes] <br /> Willow............. 150 .49 2.68 1.90 1.41 5,400 No <br /> 9. Brush ............... 1.0 .003 1.62 .03 54 3,600 Yes4 <br /> Willow............. 1.0 .003 1.62 .03 54 3,600 No <br /> 9b Willow............. 1.0 .003 1.19 .03 40 3,600 Yes4 <br /> ge Brush ............... 1.0 .003 .88 .03 29 3,600 No <br /> Willow............. 1.0 .003 .88 .03 29 3,600 No <br /> 10 Willow............. 400 1.3 3.87 5.08 .76 No <br /> 11 Brush ............... 21 .07 2.53 .27 9.4 7,200 No <br /> Mesquite .......... 21 .07 .46 .27 1.7 7,200 No <br /> 12 Willow.._.......... 30 .10 1.52 .38 4.0 3,600 No <br /> 13 Brush ............... 'N/A 'N/A 1.61 No <br /> 14 Brush ............... 120 .39 3.25 1.52 2.14 7,200 No <br /> Willow............. 120 .39 1.74 1.52 .80 No <br /> 15 Brush ............... 100 .33 1.90 1.27 1.50 1,800 No <br /> Willow............. 100 .33 1.90 1.27 1.50 1,800 No <br /> 16 Brush ............... 150 .49 2.17 1.90 1.14 5,400 Yes] <br /> 17 Brush ............... 49 .16 1.52 .62 2.45 900 No <br />~ Palo verde........ 49 .16 1.52 .62 2.45 900 No <br />18 Brush ............... 130 .43 2.98 1.65 1.81 5,400 No <br />19. Willow............. .6 .002 1.09 .02 54 3,600 Yes4 <br /> 19b S.lteedar .......... .6 .002 .62 .02 31 3,600 Yes4 <br /> ] Removal is not considered possible, and flow duration not estimated if ratio of shear stress to critical shear stress is less than I. <br /> 2Channel boundaries are partially composed of soil cement or firm earth and are considered stable. <br /> 30bliterated. <br /> 4Scoured. <br /> Data Collection and Analysis 19 <br />