Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />. <br /> <br />10,000 TREES. PHASE TWO <br /> <br />BID SCHEDULE A - (Area to the south and west of the pedestrian bridge crossing the <br />South Platte.) Total cost for the installation of irrigation, seeding, soil preparation, and <br />the supplying of planting materials. tree kits, etc. (excluding wetland plant material and <br />grading) . <br /> <br />($ <br /> <br />Total Dollars in words <br /> <br />BID SCHEDULE B - (Area to the north and east of the pedestrian bridge crossing the <br />South Platte.) Total cost for the installation of irrigation, seeding, soil preparation, and <br />the supplying of planting materials, tree kits, etc. (excluding wetland plant material and <br />grading). <br /> <br />($ <br /> <br />Total Dollars in words <br /> <br />BID SCHEDULE C - Total cost to supply all wetland plantings (non-irrigated) along <br />Lake No.2 and along South Platte River, including soil prep. and grading. <br /> <br />($ <br /> <br />Total Dollars in words <br /> <br />GRAND TOTAL <br />for Schedules A, Band C <br /> <br />s <br /> <br />Grand Total (written in words) <br /> <br />PF-2 <br />