Laserfiche WebLink
<br />PREFACE <br /> <br />This report is part of a program by the Colorado Water Conservation Board (CWCB) to make <br />approximate floodplain maps prepared by the Federal Emergency Management Agency (FEMA) <br />easier for local governments to use, This ewCB report provides limited engineering information <br />to support the approximate delineations on the maps, and it provides floodplain management <br />information to guide the local governments in the use of the maps, <br /> <br />The official floodplain information for the City of Leadville is the Rood Hazard Boundary Map <br />(FHBM), dated March 7, 1975, The FHBM was prepared by the Federal Insurance Administration <br />(PIA), however this federal map does not have any published information accompanying it to <br />describe either the engineering basis of the map or the manner in which the county could use it for <br />floodplain management. The initial purpose of this report, therefore, is to provide the cornmunity <br />with limited supporting information, The report includes a description of a hydrologic analysis that <br />was performed for the community as part of the CWCB's technical assistance program. The <br />hydrologic analysis is consistent with the map in this report, In addition, the report gives the <br />community some basic information about floodplain management and it gives some alternatives <br />that could be considered in formulating and implementing its floodplain management objectives, <br /> <br />A second function of this report is to assure that the FHBM meets the basic technical requirements <br />for designation and approval by the CWCB, Without a report and without a hydrologic analysis, a <br />map like the FHBM for Leadville cannot qualify for CWCB designation. Colorado statutes require <br />that local governments obtain from the CWCB the designation and approval of floodplain <br />information prior to its use for regulatory purposes, This report provides a means for the FHBM to <br />meet that statutory objective, <br /> <br />The FHBM was prepared prior to the completion of a CWCB document entitled Guidelines for <br />Determining lOO-year Flood Flows for Approximate Floodplains (Guidelines). That document <br />provides the necessary hydrologic information in support of the lOO-year floodplain boundaries <br />identified on the FHBM, The hydrologic information contained in the Guidelines was used in <br />preparing this report and it supports the subsequent designation of the Leadville FHBM, <br />