My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01265
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01265
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 12:58:20 PM
Creation date
10/4/2006 9:53:35 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Title
Colorado River Storage Project and Participating Projects for Fiscal Year 1973
Date
1/1/1973
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />RATE OF REPAYMENT-CRSP <br /> <br />Revenues earned by the CASP from <br />the sale at water and power and applied <br />on repayment 01 the Federal investment <br />in the project totaled approximately <br />$13,8 million in Fiscal Year 1973 as <br />shown in Exhibit D. This was the largest <br />annual amount applied to date and <br />represented one-third 01 the lotal <br />amount applied on repayment since <br />first service was available from the <br />project. In addition to the amount ap- <br />plied on repayment, the project earned <br />revenue sufficient to pay all operation, <br />maintenance, and interest Charges. <br /> <br />About $13.3 million, or 96 percent, of <br />the revenue used tor repayment came <br />Irom the sale 01 electric power and was <br />all applied on the power investment. As <br />at the end 01 the year-the tenth year <br />since power operations began-ap- <br />proximately 8 percent and 5.5 percent, <br />respectively, 01 the current and esti- <br />mated ultimate power investments had <br />been repaid. Total revenue from power <br /> <br />28 <br /> <br />operations came to about $38 million <br />during the year, The amount was larger <br />than originally anticipated due to a <br />court order which required extra re- <br />leases of water from lake Powell to <br />prevent reservoir water ffom entering <br />the Rainbow Bridge National Monu- <br />ment. The court order was in effect <br />about two months. <br /> <br />Approximately $400,000 01 revenue <br />came from municipal and industrial <br />water service provided Irom GRSP <br />fesefvoirs. About $100,000 of this was <br />applied to operation, maintenance, and <br />interest charges and about $300,000 <br />to repayment 01 the municipal and in- <br />dustrial water investment. Through Fis- <br />cal Year 1973 about $740,000 01 repay~ <br />ment had come from municipal and in- <br />dustrial water service. All has been <br />applied to the municipal and industfial <br />water investment which now totals <br />about $49 million. The investment is <br />projected to increase to about $315 <br />million when all anticipated service is <br />provided. <br />Revenue from irrigation service came <br />from seven participating proJects. The <br />revenue, totaling approximately $234,- <br />000, was applied against the current <br />$121 million participating project irri- <br />gation investment. This investment is <br />estimated to reach about $844 million <br />when all authorized partiCipating pro- <br />Jects are constructed. In addition to <br />the participating projects irrigation in- <br />vestment, approximately $1 00 million of <br />the cost of the storage units has been <br />allocated to irrigation. No repayment <br /> <br />on this is scheduled to be made until <br />the municipal and industrial water in~ <br />vestment of the storage units has been <br />repaid. The municipal and industrial <br />water revenue, and later net power <br />revenue, will then be applied to repay- <br />ment of the storage units irrigation <br />cost. <br /> <br />Projections using current estimates 01 <br />CRSP income, costs, and construction <br />schedules show that adjustments will <br />be required to assure that apportloned <br />revenues will be available on time to <br />meet future repayment reqUirements 01 <br />the irrigation costs of variOuS partici- <br />pating projects, Current GRSP repay- <br />ment studies based on the new power <br />selling rate, scheduled to go into effect <br />April 1 , 1974, show that first apportion- <br />ed revenues for participating projects <br />will become available in Fiscal Year <br />2015, about three years later than was <br />projected a year ago. This delay and <br />attendant reduction in apportioned <br />revenues postpone projected payout 01 <br />some authorized participating projects <br />beyond their allowable 50-year repay- <br />ment period. It is impossible to pre- <br />cisely project what adj.ustments may be <br />reqUired in the future to remedy this <br />situation since some adjustments will <br />automatically result lor various reasons <br />including changes in the cost and <br />scheduling 01 the participating projects. <br />Nevertheless. it is probable that further <br />upward adjustment In the power selling <br />rate will be necessary, especially il <br />powef operation costs continue to in- <br />crease <br />
The URL can be used to link to this page
Your browser does not support the video tag.