My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01265
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01265
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 12:58:20 PM
Creation date
10/4/2006 9:53:35 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Title
Colorado River Storage Project and Participating Projects for Fiscal Year 1973
Date
1/1/1973
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ALLOCATION <br />OF FEDERAL <br />INVESTMENT <br /> <br />A preliminary allocation of total esti- <br />mated costs for all authorized projects, <br />including the provisionally authorized <br />Uintah Unit of the Central Utah Project. <br />is summarized in the table on the righl. <br />Allocations 10 the various purposes <br />authorized under Reclamation law are <br />required by Section 6 of Public Law <br />84-485, the Colorado River Storage <br />Project Act, excluding specific Fish <br />and Wildlife and Recreation expendj. <br />tures authorized by Section 8 of this <br />Act. Final allocation reports have been <br />prepared on the Florida. Paonia. Sill <br />and Smith Fork Projects, and the Vernal <br />Unit of the Central Utah Project-all <br />other allocations are tentative. (See <br />Exhibit B in Appendix lor authorized <br />projects and individual project costs <br />by purpose served.) <br /> <br />ALLOCATION OF ESTIMATED COSTS <br /> <br />Percenl <br />(Thouunds 01 Total <br />01 DOllars) Alloc!lllon <br /> <br />Project Costs Allocated (Excludes Section 8 Costs) <br />Reimbursable Allocations: <br />Irrigation <br />Power <br />Municipal and Industrial Water <br />Other <br />Total <br /> <br />Nonreimbursable Allocations: <br />Flood Control <br />Fish and Wildlife <br />Recreation <br />Road Relocation Costs, Public Law 87.874 <br />Total <br /> <br />Other: <br />Navajo Indian Irrigation Project' <br /> <br />Total Costs Allocated <br /> <br />Section 8 Costs: <br />Fish and Wildlife <br />Recreation <br />Total Costs Not Allocated <br /> <br />TOTAL <br /> <br />943,126 <br />669,198 <br />317,728 <br />_ _~B~~ <br />1,953,860 <br /> <br />41.3 <br />30.2 <br />13.9 <br />,2 <br />85,6 <br /> <br />14,126 <br />87,515 <br />4,975 <br />15,137 <br />121.753 <br /> <br />,6 <br />38 <br />.2 <br />,] <br />5,3 <br /> <br />207,500 <br /> <br />9,' <br /> <br />2,283,113 <br /> <br />100.0 <br /> <br />40.645 <br />41,673 <br />82.318 <br /> <br />2,365,431 <br /> <br />'R",paynlfml of construcf.on COSIS IS suo/ecf 10 th", Act of July I. 1932 (47 Stat 564) <br /> <br />25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.