Laserfiche WebLink
<br />Table 7.\ <br /> <br />CostApport;onm~nl <br />(Federa1.ndNon_Feder.l~~nsibilitie') <br /> <br />The non-Federal sponsor shall perform, or cau~ to be performed, such investiga- <br />tions for huardous substances ., are determined ncces>ary by the Government or the <br />non-Federal sponsor to identify the existence and cxtent of any hal.ardous substances <br />regulated llnderthe Comprehensive Environmental Response, Compensation, and U!lbil- <br />ity Act (CERCLA) 42 USC 9601-9675 on lands necessary for project construdion, <br /> <br />Fedcn>lCost <br /> <br />S5%otlOt~1 <br /> <br />Non Fedcml CoSl 45%nftotll <br />Non-Federal ConsuuellOn hems (LERRO) <br />5% Cash Contribution <br />Total Non.FcdcratCosl <br /> <br />o~rntion,andmaintenance. <br /> <br />The non-Federal sponsor shall assume financial responsibility for the cleanup of <br />hazardous materials located on project lands and covered under CERCLA and shall be <br />responsibleforopcrating, maintaining, repairing,rcplacing,andrehabilitatingtheproject <br />in such a manner that liability will not arise under CERCLA. <br /> <br />Total Con'lruction COSl <br /> <br />L92t,618 2,52S,297 <br />(1,921.600) <br />1.4()I,962 I,S26,5R~ <br />174.925 229,204 <br />1,576.S87 2,055,793 <br />(1,576,900) <br />3,49&,505 4,584.0R9 <br />(3.498,500) <br /> <br />COST API'ORTlOXMEXT <br /> <br />Federal Con~lruclion !tenos <br />Di,'orsionChannci(soesumm,ry) <br />StmcturtoS(=sunlmary) <br />Planuing, Engr, and Design <br />CotlSlruClionMal\agcrntnl <br />SublNal <br /> <br />The estimated baseline construction cost of $3,49H,500 for th~ Sde<:led 30-year pli!ll <br />r~nects November 1992 price levels with no escalation. 'Price escalation may occur <br />during the design and construction phascs. To provide both lhcFtxleral Government and <br /> <br />thespo'wlr with;.! prujCdooSlc,tima,eth;.,.rcflcctsanticipatcdpricccscalatio~" a "full)' <br /> <br />I'",,-Fe<le,.1 Con"ruction ltom' (1.ERltl)) <br />Land,. EasomenlS,RighlS-of-wuy and Di'!l<l>,al Area, <br />Rclocahons(=sumrnary) <br />PIMntng,Eng,.andDo,ign <br />COOSlnlClionM.1nagcn,clLl <br />SublQtI1t <br /> <br />fundtxlcslimate" has bcen dcvel<.lped. This e~timateis based on standardi7.o:d escalation <br />factors (approvcd by the OfliceofManagemenl and Budget) for futureyca rsandisused <br />to idcntify projeet,,,,l actual projecl construction co,ts. The full funding estimate assumes <br />thc initiation of construction in fiscal ycar~ 2000 and 2001. <br /> <br />TowiConsrructionCnS1 <br /> <br />Thc apportionrncnt of estimated project construction costs, both !la,e1iTlc and fully <br />funded, between the Federal GovemmcntaTlll the non-Federal sponsor are presented in <br />ublc 7-1. A detailed smnmary of the baseline con,truClion items and a cost apponion. <br />ment brC<lkout ofspccific proj<'Ct cost itcms from the original ,'ost ~stimatt' (AppcmJix E) <br /> <br />7-3 <br /> <br />7-4 <br /> <br />CosI8ulII.1IC($) <br />llasdine F1IllyFundod <br />Kl~>O~S 1.073,279 <br />I,OOS.033 t,3t8,6I13 <br />)M.077 219,)7t <br />109,385 t46.248 <br />2,0%.543 2,7S7,501 <br /> <br />3i\.O,OOO <br />919,799 <br />73.298 <br />4g,H,5 <br />1.401.962 <br /> <br />456,480 <br />1,206.776 <br />97.'i'J9 <br />65.333 <br />t,826,588 <br /> <br />3,498.505 <br /> <br />4,5~~.(lR9 <br />