|
<br />Table 7.\
<br />
<br />CostApport;onm~nl
<br />(Federa1.ndNon_Feder.l~~nsibilitie')
<br />
<br />The non-Federal sponsor shall perform, or cau~ to be performed, such investiga-
<br />tions for huardous substances ., are determined ncces>ary by the Government or the
<br />non-Federal sponsor to identify the existence and cxtent of any hal.ardous substances
<br />regulated llnderthe Comprehensive Environmental Response, Compensation, and U!lbil-
<br />ity Act (CERCLA) 42 USC 9601-9675 on lands necessary for project construdion,
<br />
<br />Fedcn>lCost
<br />
<br />S5%otlOt~1
<br />
<br />Non Fedcml CoSl 45%nftotll
<br />Non-Federal ConsuuellOn hems (LERRO)
<br />5% Cash Contribution
<br />Total Non.FcdcratCosl
<br />
<br />o~rntion,andmaintenance.
<br />
<br />The non-Federal sponsor shall assume financial responsibility for the cleanup of
<br />hazardous materials located on project lands and covered under CERCLA and shall be
<br />responsibleforopcrating, maintaining, repairing,rcplacing,andrehabilitatingtheproject
<br />in such a manner that liability will not arise under CERCLA.
<br />
<br />Total Con'lruction COSl
<br />
<br />L92t,618 2,52S,297
<br />(1,921.600)
<br />1.4()I,962 I,S26,5R~
<br />174.925 229,204
<br />1,576.S87 2,055,793
<br />(1,576,900)
<br />3,49&,505 4,584.0R9
<br />(3.498,500)
<br />
<br />COST API'ORTlOXMEXT
<br />
<br />Federal Con~lruclion !tenos
<br />Di,'orsionChannci(soesumm,ry)
<br />StmcturtoS(=sunlmary)
<br />Planuing, Engr, and Design
<br />CotlSlruClionMal\agcrntnl
<br />SublNal
<br />
<br />The estimated baseline construction cost of $3,49H,500 for th~ Sde<:led 30-year pli!ll
<br />r~nects November 1992 price levels with no escalation. 'Price escalation may occur
<br />during the design and construction phascs. To provide both lhcFtxleral Government and
<br />
<br />thespo'wlr with;.! prujCdooSlc,tima,eth;.,.rcflcctsanticipatcdpricccscalatio~" a "full)'
<br />
<br />I'",,-Fe<le,.1 Con"ruction ltom' (1.ERltl))
<br />Land,. EasomenlS,RighlS-of-wuy and Di'!l<l>,al Area,
<br />Rclocahons(=sumrnary)
<br />PIMntng,Eng,.andDo,ign
<br />COOSlnlClionM.1nagcn,clLl
<br />SublQtI1t
<br />
<br />fundtxlcslimate" has bcen dcvel<.lped. This e~timateis based on standardi7.o:d escalation
<br />factors (approvcd by the OfliceofManagemenl and Budget) for futureyca rsandisused
<br />to idcntify projeet,,,,l actual projecl construction co,ts. The full funding estimate assumes
<br />thc initiation of construction in fiscal ycar~ 2000 and 2001.
<br />
<br />TowiConsrructionCnS1
<br />
<br />Thc apportionrncnt of estimated project construction costs, both !la,e1iTlc and fully
<br />funded, between the Federal GovemmcntaTlll the non-Federal sponsor are presented in
<br />ublc 7-1. A detailed smnmary of the baseline con,truClion items and a cost apponion.
<br />ment brC<lkout ofspccific proj<'Ct cost itcms from the original ,'ost ~stimatt' (AppcmJix E)
<br />
<br />7-3
<br />
<br />7-4
<br />
<br />CosI8ulII.1IC($)
<br />llasdine F1IllyFundod
<br />Kl~>O~S 1.073,279
<br />I,OOS.033 t,3t8,6I13
<br />)M.077 219,)7t
<br />109,385 t46.248
<br />2,0%.543 2,7S7,501
<br />
<br />3i\.O,OOO
<br />919,799
<br />73.298
<br />4g,H,5
<br />1.401.962
<br />
<br />456,480
<br />1,206.776
<br />97.'i'J9
<br />65.333
<br />t,826,588
<br />
<br />3,498.505
<br />
<br />4,5~~.(lR9
<br />
|