My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01211
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01211
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:02:55 PM
Creation date
10/4/2006 9:51:31 PM
Metadata
Fields
Template:
Floodplain Documents
County
Pueblo
Community
Pueblo
Stream Name
Fountain Creek
Title
Pueblo Flood Control Project
Date
1/1/1990
Prepared For
Pueblo County
Prepared By
US Army Corps of Engineers
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />IV - GEOLOGY AND SOILS DESIGN <br /> <br />4-01 <br />4-02 <br />4-03 <br />4-04 <br />4-08 <br />4-10 <br />4-11 <br />4-12 <br />4-13 <br />4-14 <br />4-15 <br />4-16 <br />4-17 <br />4-18 <br />4-19 <br />4-20 <br /> <br />General Geology <br />Fountain Creek Geology <br />Subsurface Investigation and Soil Conditions <br />Soil Conditions <br />Slope Stability Analyses <br />Soil Strength Parameters <br />End of Construction <br />Steady Seepage <br />Critical Flood Stage <br />Sudden Drawdown <br />Soil Cement Slope Stability <br />Excavation and Borrow Areas <br />Seepage Analyses <br />Soil Levee Section <br />Flood Wa 11 <br />Soil Cement Levee <br /> <br />v - CONSTRUCTION MATERIALS <br /> <br />5-01 <br />5-02 <br />5-03 <br />5-04 <br />5-05 <br /> <br />Embankment Materials <br />Soil Cement Materials <br />Concrete and Concrete Aggregates <br />Riprap <br />Bedding Material <br /> <br />VI - STRUCTURAL DESIGN <br /> <br />6-01 <br />6-02 <br />6-03 <br /> <br />Genera 1 <br />Two 48-inch RCP Under Levee at Station 67+30 <br />Two New 48-Inch RCP and One Existing 24-Inch <br />Under Soil Cement Levee at Station 6+00W <br />Flood Wall <br />Flood Wall and Parapet Wall on East Levee <br /> <br />6-04 <br />6-05 <br /> <br />VII - ENVIRONMENTAL CONSIDERATIONS <br /> <br />7-01 <br />7-02 <br />7-03 <br />7-04 <br /> <br />General <br />Environmental Impact <br />Mitigation Features <br />Environmental Quality Enhancement Measures <br /> <br />VIII - ENVIRONMENTAL QUALITY CONTROL <br /> <br />8-01 <br />8-02 <br />8-03 <br />8-04 <br /> <br />Water Quality <br />Air Quality <br />Section 404 Requirements <br />Construction Procedures <br /> <br />IX - ACCESS ROADS <br /> <br />9-01 <br /> <br />General <br /> <br />ii <br /> <br />. <br /> <br />IV-I <br />IV-I <br />IV-I <br />IV-l <br />IV-2 <br />IV-3, <br />IV-lf <br />IV-lf <br />IV-lf <br />IV-l, <br />IV-~I <br />IV-~, <br />IV-~, <br />IV-5 <br />IV-f, <br />IV-6 <br /> <br />V-I <br />V-I <br />V-I <br />V-I <br />V-3 <br /> <br />. <br /> <br />VI-I <br />VI-I <br /> <br />VI-2 <br />VI-2 <br />VI-2 <br /> <br />VII-I <br />VII-l <br />VII-I <br />VII-l <br /> <br />VIII-l <br />VI II-I <br />VIII-l <br />VIII-l <br /> <br />. <br /> <br />IX-I <br />
The URL can be used to link to this page
Your browser does not support the video tag.