Laserfiche WebLink
<br />.. <br /> <br />Page 4 of 5 I Issue Date: MAY t" 2004 I Effective Date: SEP t 5 2004 I Case No,: 02-08-447P ILOMR-APP <br /> <br />t' <br /> <br />~.ART..,~ <br />..,.~;!'~ <br />:of ~ <br />.~ <br /> <br /><~JVD sW <br /> <br />Federal Emergency Management Agency <br />. Washington, D_C, 20472 <br /> <br />LETTER OF MAP REVISION <br />DETERMINATION DOCUMENT (CONTINUED) <br /> <br />COMMUNITY INFORMATION (CONTINUED) <br /> <br />We have enclosed a document entitled "List of Current Flood Insurance Study Data," which inclndes this letter, to help your community <br />maintain all information for floodplain management and flood insurance, If any of the items in that document are not filed in your <br />commwrity's map repository, please contact the FEMA Map Assistance Center at the number listed below for information on how to <br />obtain those items, <br /> <br />We have designated a Consultation Coordination Officer (CCO) to assist your commwrity, The CCO will be the primary liaison between <br />your commwrity and FEMA For information regarding your CCO, please contact: <br /> <br />Mr, Steve L. Olsen <br />Director, Federallnsurance and Mitigation Division <br />Federal Emergency Management Agency, Region V1II <br />, Denver Federal Center, Building 710' <br />p ,0, Box 25267 <br />Denver. CO 80225-0267 <br />(303) 235-4830 <br /> <br />STATUS OF THE COMMUNITY NFlP MAPS <br /> <br />We are processing a revised FIRM and FIS report for the City and County of Broomfield, The revised FIRM and FIS report will become <br />effective on August 18,2004. Because the effective date has already been established, we will not incorporate the modifications made by <br />this LOMR into the revised FIRM and FIS report before they become effective, However, because the effective date of this LOMR is <br />later than the effective date of the FIRM, the updated map panel numbers, profile panel numbers, and vertical datnm were used for the <br />annotated FIRM and FIS report included with this LOMR, Because this LOMR used the updated FIRM and FIS report, the modifications <br />made by this LOMR will not be superseded when the revised FIRM and FIS report become effective, The modifications made by this <br />LOMR will be incorporated the next time the FIRM and FIS report are republished, <br /> <br />This determination is based on the flood data presently available. The enclosed documents provide additional information regarding this determination. If <br />you have any Questions about this document, please contact the FEMA Map Assistance center toll free at 1-877-336-2677 (1-877-FEMA MAP) or by letter <br />addressed to the LOMR Depot. 3601 Eisenhower Avenue. Alexandria, VA 22304. Additional information about the NFIP is available an our website at <br />htto://wNIN.fema.oov/nfio. <br /> <br />~e~ <br /> <br />Kevin C, Long, CFM, Project Engineer <br />Hazard Identification Section <br />Mitigation Division <br />Ememencv PreDaredness and Re500nse Directorate <br /> <br />10080301,DAU20804471021AC <br />