Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br /> <br />Acknowledgements <br /> <br />The assistance of Mr. Ed Hartman, private citizen, Town of Parker <br />is appreciated. <br /> <br />Related Flood Studies <br />-- <br /> <br />I <br />I <br />I <br />I <br /> <br />The lOa-year floodplain of Tallman Gulch Tributary No. I has been <br />delineated upstream of the study reach. The engineering firm of Emmons, <br />Henry, Messenheimer and Gende, Inc. (EHMG) delineated the floodplain <br />upstream of the south property line of the Rowley Downs Subdivision <br />(immediately upstream of the study reach). (See Ref. 2). <br /> <br />Tallman Gulch Tributary No. 1 flows into Tallman Gulch. The <br />floodplain for Tallman Gulch has been delineated by the engineering firm <br />of Howard, Needles, Tamman and Bergendoff (HNTB) (see Ref. 5). The <br />floodplain for Tillman Gulch extends 600 feet up Tallman Gulch Tributary <br />No. 1. <br /> <br />The lOa-year floodplain delineated in this report ties into the <br />100-year floodplains upstream and downstream of the study reach. <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br />I <br />I <br />I <br /> <br />1-- <br /> <br />2 <br /> <br />