Laserfiche WebLink
<br />-. <br /> <br /> <br />Federal Emergency Management Agency <br />Washington, D.C. 20472 <br /> <br />MAR 2 7 2002 <br /> <br />CERTIFIED MAIL <br />RETURN RECEIPT REQUESTED <br /> <br />IN REPLY REFER TO: <br />Case No.: 02-08-083R <br /> <br />The Honorable Karen Stuart <br />Mayor, City and County of Broomfield <br />One DesCombes Drive <br />Broomfield, CO 80020 <br /> <br />Community: City and County of <br />Broomfield, CO <br />Community No.: 085073 <br /> <br />104 <br /> <br />Dear Mayor Stuart: <br /> <br />This responds to a request that the Federal Emergency Management Agency (FEMA) comment on the <br />effects that a proposed project would have on the effective Flood Insurance Rate Map (FIRM) for your <br />community in accordance with Part 65 of the National Flood Insurance Program (NFIP) regulations. In a <br />letter dated December 3, 2001, Mr. Dan Blankenship, P.E., City of Westminster, requested that FEMA <br />evaluate the effects that proposed channelization and relocation of Quail Creek would have on the flood <br />hazard information shown on the effective FIRM. <br /> <br />The proposed project consists of channelizing and relocating Quail Creek between Huron Street and Big <br />Dry Creek and relocating the Bull Canal. The Quail Creek channel will contain the flood having a <br />I-percent chance of being equaled or exceeded in any given year (base flood). <br /> <br />All data required to complete our review ofthis request for a Conditional Letter of Map Revision <br />(CLOMR) were submitted with letters from Mr. Frank Casteleneto, P.E., City of Thomton, Mr. Burt <br />Knight, P.E., City and County of Broomfield, Mr. Edward L. Lind, P.E., Felsburg Holt & UlIevig, and Mr. <br />Blankenship. <br /> <br />We reviewed the submitted data and the data used to prepare the effective FIRM for your community and <br />determined that the proposed project meets the minimum floodplain management criteria of the NFIP. We <br />believe that, if the proposed project is constructed as shown on the drawings entitled "Quail CreeklBull <br />Canal Relocation," prepared by Felsburg Holt & UlIevig, dated September 11,2001, and the data listed <br />below are received, the floodplain boundaries of the base flood will be delineated as shown on the drawing <br />entitled "Proposed Floodplains," prepared by Felsburg Holt & Ullevig, dated February 28, 2002. <br /> <br />As a result of the proposed project, an area of shallow flooding (designated Zone X (shaded)) located at <br />the northwest corner of Huron Street and 136th Avenue will be removed from the FIRM. <br /> <br />Upon completion of the project, your community may submit the data listed below and request that we <br />make a final determination on revising the effective FIRM. <br /> <br />. Detailed application and certification forms, which were used in processing this request, must be <br />used for requesting final revisions to the maps. Therefore, when the map revision request for the <br />area covered by this letter is submitted, Form I, entitled "Revision Requester and Community <br />Official Form," must be included. (A copy of this form is enclosed.) <br />