My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01123
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01123
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2010 10:15:21 AM
Creation date
10/4/2006 9:47:57 PM
Metadata
Fields
Template:
Floodplain Documents
County
Adams
Douglas
Arapahoe
Community
Aurora
Stream Name
Westerly Creek Overflow
Title
LOMR - Affected Panel 080002 0180 E - Case No. 96-08-158P
Date
4/16/1996
Prepared For
Aurora
Prepared By
FEMA
Floodplain - Doc Type
Historic FEMA Regulatory Floodplain Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~! <br /> <br />2 <br /> <br />Location <br /> <br />Existing BFE Modified BFE <br />(feet)* (feet)* <br />None 5,431 <br />5,434 5,432 <br />5,435 5,435 <br />None 5,431 <br />None 5,421 <br /> <br />Westerly Creek: <br />Approximately 850 feet downstream of Havana Street <br />Approximately 400 feet downstream of Havana Street <br />At Havana Street <br /> <br />Westerly Creek Overflow, <br />Just downstream of divergence from Westerly Creek <br />Approximately 1,000 feet downstream of divergence <br />from Westerly Creek <br /> <br />*National Geodetic Vertical Datum, rounded to nearest whole foot <br />Under the above,mentioned Acts of 1968 and 1973, the Mitigation Directorate must develop <br /> <br />criteria for floodplain management. For the community to participate in the National Flood Insurance <br /> <br />Program (NFIP), the community must use the modified BFEs to administer the floodplain management <br /> <br />measures of the NFIP. These modified BFEs will also be used to calculate the appropriate flood <br /> <br />insurance premium rates for new buildings and their contents and for the second layer of insurance on <br /> <br />existing buildings and contents. <br /> <br />Upon the second publication of notice of these changes in this newspaper, any person has 90 days <br /> <br />in which he or she can request, through the Chief Executive Officer of the community, that the Mitigation <br /> <br />Directorate reconsider the determination. Any request for reconsideration must be based on knowledge <br /> <br />of changed conditions or new scientific or technical data. All interested parties are on notice that until <br /> <br />the 90,day period elapses, the Mitigation Directorate's determination to modify the BFEs may itself be <br /> <br />changed. <br /> <br />Any person having knowledge or wishing to comment on these changes should immediately notify: <br /> <br />The Honorable Paul E. Tauer <br />Mayor, City of Aurora <br />1470 South Havana Street, Suite 808 <br />Aurora, Colorado 80012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.