My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01117
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01117
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 12:58:24 PM
Creation date
10/4/2006 9:47:46 PM
Metadata
Fields
Template:
Floodplain Documents
Designation Number
219
County
Arapahoe
Community
Littleton
Stream Name
Upper Slaughterhouse Gulch
Title
Major Drainageway Planning - Upper Slaughterhouse Gulch
Date
3/1/1983
Designation Date
7/1/1983
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br /> <br />SHEET 7 DISCUSSION <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />The improvements shown on this sheet consist of construction of a storm <br /> <br /> <br />sewer with a 5-year capacity of approximately 256 cfs. The upper end of the <br /> <br />proposed system should be tied into the manhole at the intersection of Arapahoe <br /> <br /> <br />Road and Downing Street. The alignment of the proposed system can be similar <br /> <br />to what is shown on Sheet 7 with the existing 15-inch RCP providing additional <br /> <br /> <br />capacity of approximately 7.0 cfs (Reference-9). If there are less utility <br /> <br /> <br />conflicts, the existing 15-inch RCP can be removed and the trench utilized for <br /> <br /> <br />the proposed system. <br /> <br />Cost of Proposed Improvements <br /> <br />A. Storm Sewer <br />I. 60" RCP (1800 L.F.).... ....................... .................. .$252,000 <br />2 . 63" x 98" RCP (250 L. F . ) . .. . .. .. .. . .. .. . . . .. . . .. .. .. . .. .. .. .. . . .. $ 87, 500 <br /> <br />3. Manholes (5)........... ................................. .........$ 12,500 <br /> <br />4. Inlets (8).......................................................$ 16,000 <br /> <br />Contingency (15%)................... <br /> <br />7,000 <br /> <br />I <br />I <br />I <br />I <br />I <br /> <br />B. Utility Relocation (2050 L.F.).......................................$ 12,300 <br /> <br />SUB-TOTAL $380,300 <br /> <br />Legal and Administrative (5%)....... 19,000 <br /> <br />I <br />I <br /> <br />SUB-TOTAL $456,300 <br /> <br />Engineering (15%)................... 68,400 <br /> <br />TOTAL CONSTRUCTION COST $524,700 <br /> <br />C. Annual Operation and Maintenance.....................................$ 2,100 <br /> <br />I <br />I <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.