Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />SHEET 6 DISCUSSION <br /> <br />Contingency (15%).................. <br /> <br />29,900 <br /> <br />I <br /> <br />Legal and Administrative (5%)...... <br /> <br />10,000 <br /> <br />I <br /> <br />The proposed improvements shown on this sheet include a spill structure on <br /> <br /> <br />the Denver Highline Canal and a portion of the outfall sewer along Downing Street. <br /> <br />This will provide a formal designated spill area into the proposed detention <br /> <br /> <br />facility. The design of the structure is to be in accordance with the recommenda- <br /> <br /> <br />tions contained in the Denver Highline Canal Master Plan (Reference-8). <br /> <br />SUB-TOTAL $239,100 <br /> <br />Engineering (15%)................... 35,900 <br /> <br />I <br /> <br />TOTAL CONSTRUCTION COST $275,000 <br /> <br />I <br /> <br />D. Annual Operation and Maintenance.....................................$ SOO <br /> <br />The proposed 63" x 98" HERCP storm sewer along South Downing and Panama Drive <br /> <br /> <br />will daylight at the Denver Highline Canal along the property line between the <br /> <br /> <br />residences located just north and east of the South Downing Street intersection. <br /> <br />The 63" x 98" HERCP is required because of the hydraulic condition at the outlet <br /> <br /> <br />(i.e., water surface in canal) and the relatively flat topography. <br /> <br />I <br /> <br />I <br /> <br />The existing IS-inch RCP storm sewer can either be removed or if there is <br /> <br /> <br />adequate room abandoned in place. In either case the triple inlet on the north <br /> <br /> <br />side of Panama Drive and the double inlet on the south side of Panama Drive (just <br /> <br />west of South Marion Street) should remain operational as well as the outlet pipe <br /> <br />in to the Denver Highline Canal. This will provide for local drainage from Panama <br /> <br /> <br />Drive and South Marion Street. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Cost of Proposed Improvements <br /> <br />I <br /> <br />A. Storm Sewer <br />I. 63" x 98" RCP (450 L.F.).........................................$157,500 <br /> <br />2. Manholes (2)..................................................... $ 5,000 <br /> <br />3. Inlets (2).......................................................$ 4,000 <br /> <br />4. Structures............ ...........................................$ 10,000 <br /> <br />I <br /> <br />I <br /> <br />B. Spill Structure............................".",..,. ,.........:..... ,$ 20,000 <br /> <br />I <br /> <br />C. Utility Relocation (450 L.F.)........................ ................$ 2,700 <br /> <br />I <br /> <br />SUB-TOTAL $199,200 <br /> <br />I <br /> <br />I <br />