Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />SHEET 5 DISCUSSION <br /> <br />The improvements on this sheet consist of a 5-year capacity storm sewer <br /> <br /> <br />collector system. The system collects local runoff from Maplewood Drive, South <br /> <br />Clarkson Street, and South Pennsylvania. Additionally the outlet pipe from the <br /> <br /> <br />proposed Caley detention facility discharges directly into the storm sewer along <br /> <br />South Pennsylvania. This will eliminate the nuisance flows within the street from <br /> <br /> <br />the detention releases. <br /> <br />Cost of Proposed Improvements <br /> <br />A. Storm Sewer <br />I. 24" RCP (J 77 - L. F . ) .. . .. .. . . . . .. .. .. . . .. . . .. . .. . . .. .. .. . . . .. . .. .. $ 106 ,200 <br />2. 36" RCP (1140 L.F.)..............................................$ 9 1,200 <br />3. 32" x 49" RCP (J40 L.F.)......................,..................$ 12,600 <br /> <br />4. Manholes (10)....................................................$ 25,000 <br /> <br />5. Inlets (16)......................................................$ 32,000 <br /> <br />B. Utility Relocation (3050 L.F.).......................................$ 18,300 <br /> <br />SUB-TOTAL $285,300 <br /> <br />Contingency (15%)............,...... 42,800 <br /> <br />Legal and Administrative (5%)....... 14,300 <br /> <br />SUB-TOTAL $342,400 <br /> <br />Engineering (15%)................... 51,400 <br /> <br />TOTAL CONSTRUCTION COST $393,800 <br /> <br />C. Annual Operation and Maintenance..................................".$ 3,100 <br />