Laserfiche WebLink
<br />SHEET 3 DISCUSSION <br /> <br />c. Utility Relocation (2250 L.F.)..........,...............,............$ 13,500 <br /> <br />SUB-TOTAL $689,800 <br /> <br />The improvements shown on this sheet consist of removal of the existing storm <br /> <br />sewer and installation of 58" x 91" HERCP and 48" x 76" HERCP, upstream of the un- <br /> <br /> <br />developed area east of BroadwaY' Topographic constraints restrict the size, shape, <br /> <br />and alignment of the pipe. There are several existing utilities within the Broad- <br /> <br /> <br />way ROW, which must be verified prior to the final design. The overall proposed <br /> <br /> <br />storm sewer system will have an ultimate capacity equal to the 5-year flood event <br /> <br />after Caley detention pond is constructed. Prior to construction of Caley deten- <br /> <br /> <br />tion pond, the proposed storm sewer will have approximately a 2-year capacity. <br /> <br />Cont ingency (15%)................... 103,400 <br /> <br />Legal and Administrative (5%)....... 34,500 <br /> <br />SUB-TOTAL $827,700 <br /> <br />Engineering (15%)................... 124,200 <br /> <br />SUB-TOTAL $951,900 <br /> <br />The 600-feet of open channel across the undeveloped area east of Broadway and <br /> <br /> <br />west of Grant Street will have a 5-year capacity of 146 cfs. The grass-lined <br /> <br />channel will have a 5-foot wide concrete low flow channel and 4: 1 side slopes. A <br /> <br /> <br />concrete headwall will be required at the inlet to the proposed storm sewer system. <br /> <br />D. Site Acquisition (0.5 Ac.)..... ,.............. .......................$ 12,500 <br /> <br />TOTAL CONSTRUCTION COST $964,400 <br /> <br />E. Annual Operat ion and Maintenance..................................... $ 3,600 <br /> <br />The proposed 32" x 49" HERCP upstream of the channel will have a 5-year capa- <br /> <br /> <br />city of 57 cfs, which is the floodpeak from the 5-year storm sewer along Maplewood <br /> <br />Avenue. <br /> <br />Cost of Proposed Improvements <br /> <br />A. Open Channel <br />J. Channel (650 L.F.)...............................................$ 32,500 <br /> <br />2. Structures... .... ........ .......... ........ ................ ......$ 10,000 <br /> <br />B. Storm Sewer <br /> <br />I. 48" x 76" RCP (890 L.F.).................... .................... .$186,900 <br />2. 58" x 9 I" RCP (1100 L. F . ) .. . . . . . . .. . .. .. . .. .. .. .. .. . .. .. . . .. .. . .. $ 330 ,000 <br /> <br />3. Inlets (26)................,............".......................$ 52,000 <br /> <br />4. Manholes (14)........,.............,..,............"............ $ 32,500 <br /> <br />5, 32" x 49" RCP (360 L.F.)............ .............................$ 32,400 <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />