Laserfiche WebLink
<br />I <br /> <br />. <br /> <br />. <br /> <br />~ <br /> <br />I <br />! <br />, <br /> <br />I <br />. <br />I <br /> <br />I <br /> <br />, <br /> <br />. <br />, <br /> <br />, <br /> <br />. <br /> <br />.z _ =__ <br /> <br />o <br /> <br />. <br /> <br />- Mr. Howard Roland <br />- --, <br />Page Two - - - ~ , <br /> <br />- - -- <br />- -)- <br /> <br />. ". <br /> <br />:-.::. = ::;:; ;. .',:' -- <br /> <br />\tit ~ 5.... . : - : <br /> <br />since the Flood Insurance Study establishing the 100-year base flood <br />elevations for your community has been completed, certain additional <br />requirements must be met under Section 1361 of the National Flood <br />_J~~urance Act of 1968, as amended. The community is required, as a <br />:~ondition of continued eligibility in the National Flood Insurance <br />'-Program (NFIP),- to adopt or show evidence of adoption of flood plain <br />_management regulations that meet the standards of Section 1910.3 (d) <br />of the enclosed Program regulations (24 CPR 1909, etc.) within six <br />months of the date of this letter. These standards are the minimum <br />_ requirements and do not supersede any state or local requirements of a <br />_ 'mor.e stringent nature.. ____ ____ <br /> <br />_ The Standards of Section 1910.3 (d) which your community is required to <br />'meet are explained in brief on the attachment accompanying this letter. <br />"It'must be emphasized that all of the standards specified in this <br />. section of the program regulations must be enacted in a legally enforceable <br />-document. Some of these standards should already have been enacted by <br />..your community in order to establish initial eligiblity in the National <br />;rlood Insurance Program. Therefore, compliance by your community with <br />~the additional flood plain management requirements may be accomplished <br />_in a number of ways. For example, your community may: <br />."- -- <br /> <br />(1) <br /> <br />incorpOrate exIsting regulations by <br />any-new- regulations adopted to meet <br />requirements 9~~S=ction 1910.3 (d), <br /> <br />reference in <br />the additional <br />or <br /> <br />- - . ,-- ~~ <br />--..;-' _.~ - <br />_...... (2) adopt all of the_19l0.3 -(d) standards in one <br />__ -=!iew,dcomprehensive- set of regulations, or <br /> <br />---- - -~--Q-~~- <br />.:.c:...:.:.:c--(3f . show-evidence that reguL3.tions have previously <br />. 0 __..~: - - ,l>E!en: a,g,opted which_ meet: or exceed the minimum <br />. '0' cO'_ _ _ "_:.~_equire1llent_s of Sectio!,_ 1910: 3 (d). <br /> <br />-- -+- -.---.--.- -+ --- -- - -- -. <br />,.__: .__..__.____>~c::.... .____" <br />_Communities that fail to enact-the-necessary flood plain management <br />~regulations will be suspended from participation in the program and <br />,subject to ~he prohibitions. contained in Section 202(a) of the 1973 <br />".as amended. ___ __ <br /> <br />Act <br /> <br />--The effective date of your community's Flood Insurance Rate Map (FIRM) <br />o.~lso marks the date that actuarial rates for flood insurance will be <br />:~harged for all new construction and substantial improvements to existing <br />: structures, and these rates may be--higher if construction is not built <br />, ,in compliance with the flood pl~i~ management standards of the National <br />~Flood Insurance Program. As. you may know, the actuarial flood insurance <br /> <br />._ ____u <br />- . <br />.. - - - - -- . - <br /> <br />~.- --. ,. <br />....-,., ---- - <br /> <br />;- : _ "- ,-:..:: V:;- <br /> <br />....--=--.l-_ <br /> <br />C';;;'-. - <br /> <br />-~ -~ : <br /> <br />.J:. <br />