My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01105
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01105
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:09:24 PM
Creation date
10/4/2006 9:47:27 PM
Metadata
Fields
Template:
Floodplain Documents
County
Mesa
Community
Grand Junction
Stream Name
Colorado River
Title
Grand Junction Community File
Date
1/1/2001
Prepared For
CWCB
Prepared By
CWCB
Floodplain - Doc Type
Community File
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />J <br />I <br />I <br /> <br /> <br />~ ~~ <br /> <br />""'-- <br /> <br />"-. . <br /> <br />~ 4~J', ,'~ <br /> <br />;1 <br /> <br />SPECIAL P~CZLEM <br /> <br />l~ <br /> <br />FLOOD INSURANCE STUDIES <br /> <br />Oate: 24 Feb 76 ! <br /> <br />Identification Number: <br /> <br /> <br />Name of Community: Mesa County. Colorado <br /> <br /> <br />Study Contractor: CorDs of Engineers. Sacramento Dist. <br /> <br /> <br />'/ <br />[ <br />f.!. <br />(j) <br /> <br />PROBLEM AREA <br /> <br /> <br />TECHNICAL COORDINATION 0 <br />UNRESOLVED DISCREPANCIES 0 <br />UNREALISTIC SCHEDULE IXl <br />OTHER 0, <br /> <br />DETAILED EXPLANATION: <br /> <br />The original completion date for. the study reflected the time rp.quired to make the I <br />. study, prepare the report, and turn'it over to the Federal Insurance Administration I, <br />for the Final Coordination Heeting. On the BaGcline Schedule Plan, that scheduled [, <br />date of complction co~responds with the submittal date to the Consultation and P, . <br />~" <br />Coordination Officer. Based on the sample Baseline Schedule Plan, 4-1/2 months are r'.' <br />,., <br />required for review and coordination between the submittal date to the Consultation <br />and Cc~rdination Officer. and the completion date as identified by Item 13 on the <br />HUD Form 441 (10-75). <br /> <br />.' <br /> <br />PROPOSED SOLUTION: <br /> <br />Adjust the scheduled completion date by 4-1/2 months to 17 January 1977. <br /> <br />. <br /> <br />~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.