Laserfiche WebLink
<br />J <br />I <br />I <br /> <br /> <br />~ ~~ <br /> <br />""'-- <br /> <br />"-. . <br /> <br />~ 4~J', ,'~ <br /> <br />;1 <br /> <br />SPECIAL P~CZLEM <br /> <br />l~ <br /> <br />FLOOD INSURANCE STUDIES <br /> <br />Oate: 24 Feb 76 ! <br /> <br />Identification Number: <br /> <br /> <br />Name of Community: Mesa County. Colorado <br /> <br /> <br />Study Contractor: CorDs of Engineers. Sacramento Dist. <br /> <br /> <br />'/ <br />[ <br />f.!. <br />(j) <br /> <br />PROBLEM AREA <br /> <br /> <br />TECHNICAL COORDINATION 0 <br />UNRESOLVED DISCREPANCIES 0 <br />UNREALISTIC SCHEDULE IXl <br />OTHER 0, <br /> <br />DETAILED EXPLANATION: <br /> <br />The original completion date for. the study reflected the time rp.quired to make the I <br />. study, prepare the report, and turn'it over to the Federal Insurance Administration I, <br />for the Final Coordination Heeting. On the BaGcline Schedule Plan, that scheduled [, <br />date of complction co~responds with the submittal date to the Consultation and P, . <br />~" <br />Coordination Officer. Based on the sample Baseline Schedule Plan, 4-1/2 months are r'.' <br />,., <br />required for review and coordination between the submittal date to the Consultation <br />and Cc~rdination Officer. and the completion date as identified by Item 13 on the <br />HUD Form 441 (10-75). <br /> <br />.' <br /> <br />PROPOSED SOLUTION: <br /> <br />Adjust the scheduled completion date by 4-1/2 months to 17 January 1977. <br /> <br />. <br /> <br />~~ <br />