Laserfiche WebLink
<br />SPILLWAY RATING AJlD FLOOD ROUTING <br /> <br />HYDROLOGIC ENGIliEERING l:l!a'l'J:)!;H <br />COMPll'l'ER PROORAM 22-J2-I210 <br /> <br />1. ORIGIN OF PROORAM <br /> <br />1 <br /> <br />a. This program is a modification and translation of Tulsa <br />District program 22-Gl-G512. It was translated in the Hydrologic <br />Engineering Center Corps of Engineers, 650 Capitol Mall, Sacramento, <br />California, by Bill S. Eichert, original author of the program, fram <br />Fortran II for the General Electric 225 computer to a Fortran II <br />caumon to IBM, RCA and GE. The major' changes made in the Center were <br />the addition of a routine to make an induced surcharge operation of <br />the flood control conduit for a project with an uncontrolled spillway, <br />and the substitution of the faster Modified Pul8 routine instead of <br />the trial and errOr routine of assuming and computing the water sur- <br />face elevation (so called arithmetic method). A source deck for a <br />two-part program for the 4OK, IBM 1620 is available for computers <br />with limited memory. The version for the larger computers, GE 225-8K, <br />is shown as Exhibit 6. <br /> <br />b. Up-to-date information and copies of source statement cards <br />for various types of camputers can be obtained from the Center upon <br />request by Government and cooperating organizations. <br /> <br />2. PURPOSE OF PROORAM <br /> <br />The main purpose of this program is to compute a spillway rating <br />curve for a concrete ogee spillway with vertical walls for an assumed <br />design head, then make a flood routing of the spillway design flood <br />to determine the maximum water surface. The spillway rating computa- <br />tion is performed according to the Hydrologic Design Charts of the <br />Waterways Experiment Station. The rating can also be for a broad-crested <br />weir and can also include the discharge from a conduit or sluice. <br />The routing can be for a gated or uncontrolled spillway. The gated <br />routing uses the emergency release diagram discussed in EM 1110-2-3600. <br /> <br />3. DESCRIPl'ION OF PROGRAM <br /> <br />~ <br />. <br /> <br />a. This general description is for the one-part program. The two- <br />part program is for computers with memory equivalent to the IBM 1620 <br />with 40,000 digits of storage. Computers equivalent to the GE 225,8K <br />can take the whole program in one part and can make a trial and error <br />solution to get the proper design head "DESHD" in the spillway rating. <br />Separate runs must be made on the 2 Part program for different design <br />heads. <br /> <br />-- <br />