<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />
<br />Table 3,1
<br />
<br />Table 3,2
<br />Table 3,3
<br />Table 4,1
<br />
<br />Table 4,2
<br />
<br />Table 4,3
<br />
<br />Table 4.4
<br />
<br />Table 4,5
<br />Table 4,6
<br />
<br />Sheet 1:
<br />
<br />Sheet 2:
<br />
<br />Sheet 6:
<br />Sheet 7:
<br />
<br />TABLE OF CONTENTS (Continued)
<br />
<br />TABLES
<br />
<br />Comparison of 100- Year Water Surface Profiles for
<br />Duplicate and Corrected Effective Analyses, "",","""""'" 10
<br />Summary of Duplicate Effective Floodway Results, ,,""""""" II
<br />Summary of Corrected Effective Floodway Results, """""""" 13
<br />Comparison of Calibrated EXTRAN Modeling Results
<br />to the Effective SWMM Model. ,,"""""',""""""'" 16
<br />Summary of Pre- and Post-Project Condition Maximum Ponded
<br />Water Surface Elevations. as Computed by EXTRAN, ",.",.,.,." 19
<br />Summary of Pre- and Post-Project Condition
<br />Peak Release Rates, as Computed by EXTRAN, , , , . , , , , , , , , , , , , , , , 19
<br />Comparison of 100- Year Water Surface Profiles for
<br />Corrected Effective and Post-Project Condition Analyses, """""" 21
<br />Summary of Post-Project Condition Floodway Results, """"""" 22
<br />Comparison of Corrected Effective and Post-Project
<br />Condition 100-Year Channel Velocities, , , , , , , , , , , , , , , , , , , , , , , , , 23
<br />
<br />SHEETS
<br />
<br />Post-Project Condition Floodplain and Floodway Map
<br />(Corresponds to 1993 Work Map Sheet 6)
<br />Post-Project Condition Floodplain and Floodway Map
<br />(Corresponds to 1993 Work Map Sheet 7)
<br />Floodplain Delineation Sta, 156+70 to Sta, 184+70, 1993 Work Map,
<br />Floodplain Delineation Sta, 184+70 to Sta, 204+80, 1993 Work Map,
<br />
<br />APPENDICES
<br />
<br />Appendix A: As-Built Drawings for Centre Avenue and the Spring Creek Bridge
<br />Appendix B: Plotted Water Surface Profiles
<br />
<br />Appendix B,l:
<br />Appendix B,2:
<br />Appendix B,3:
<br />
<br />Effective (Published) Water Surface Profiles
<br />Corrected Effective Water Surface Profiles
<br />Post-Project Condition Water Surface Profiles
<br />
<br />Appendix C: Plotted HEC-2 Cross Sections
<br />
<br />Appendix C,1:
<br />Appendix C.2:
<br />Appendix C.3:
<br />
<br />Duplicate Effective HEC-2 Cross Sections
<br />Corrected Effective HEC-2 Cross Sections
<br />Post-Project Condition HEC-2 Cross Sections
<br />
<br />Appendix D: Riprap Sizing Information
<br />
<br />II
<br />
<br />ANdERSON CONSulTiNG ENGiNEERS, INC,
<br />
<br />r-'OPE!\J".<:ncsrtUl'cocsrtDl fema-l Oi\:IR rinal-rpt.\\pd
<br />
|