Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Table 3,1 <br /> <br />Table 3,2 <br />Table 3,3 <br />Table 4,1 <br /> <br />Table 4,2 <br /> <br />Table 4,3 <br /> <br />Table 4.4 <br /> <br />Table 4,5 <br />Table 4,6 <br /> <br />Sheet 1: <br /> <br />Sheet 2: <br /> <br />Sheet 6: <br />Sheet 7: <br /> <br />TABLE OF CONTENTS (Continued) <br /> <br />TABLES <br /> <br />Comparison of 100- Year Water Surface Profiles for <br />Duplicate and Corrected Effective Analyses, "",","""""'" 10 <br />Summary of Duplicate Effective Floodway Results, ,,""""""" II <br />Summary of Corrected Effective Floodway Results, """""""" 13 <br />Comparison of Calibrated EXTRAN Modeling Results <br />to the Effective SWMM Model. ,,"""""',""""""'" 16 <br />Summary of Pre- and Post-Project Condition Maximum Ponded <br />Water Surface Elevations. as Computed by EXTRAN, ",.",.,.,." 19 <br />Summary of Pre- and Post-Project Condition <br />Peak Release Rates, as Computed by EXTRAN, , , , . , , , , , , , , , , , , , , , 19 <br />Comparison of 100- Year Water Surface Profiles for <br />Corrected Effective and Post-Project Condition Analyses, """""" 21 <br />Summary of Post-Project Condition Floodway Results, """"""" 22 <br />Comparison of Corrected Effective and Post-Project <br />Condition 100-Year Channel Velocities, , , , , , , , , , , , , , , , , , , , , , , , , 23 <br /> <br />SHEETS <br /> <br />Post-Project Condition Floodplain and Floodway Map <br />(Corresponds to 1993 Work Map Sheet 6) <br />Post-Project Condition Floodplain and Floodway Map <br />(Corresponds to 1993 Work Map Sheet 7) <br />Floodplain Delineation Sta, 156+70 to Sta, 184+70, 1993 Work Map, <br />Floodplain Delineation Sta, 184+70 to Sta, 204+80, 1993 Work Map, <br /> <br />APPENDICES <br /> <br />Appendix A: As-Built Drawings for Centre Avenue and the Spring Creek Bridge <br />Appendix B: Plotted Water Surface Profiles <br /> <br />Appendix B,l: <br />Appendix B,2: <br />Appendix B,3: <br /> <br />Effective (Published) Water Surface Profiles <br />Corrected Effective Water Surface Profiles <br />Post-Project Condition Water Surface Profiles <br /> <br />Appendix C: Plotted HEC-2 Cross Sections <br /> <br />Appendix C,1: <br />Appendix C.2: <br />Appendix C.3: <br /> <br />Duplicate Effective HEC-2 Cross Sections <br />Corrected Effective HEC-2 Cross Sections <br />Post-Project Condition HEC-2 Cross Sections <br /> <br />Appendix D: Riprap Sizing Information <br /> <br />II <br /> <br />ANdERSON CONSulTiNG ENGiNEERS, INC, <br /> <br />r-'OPE!\J".<:ncsrtUl'cocsrtDl fema-l Oi\:IR rinal-rpt.\\pd <br />